Laserfiche WebLink
CONTRACTOR TO INSTALL AND MAINTAIN ALL EROSION CONTROL BMP'S AS SHOWN ON THIS PLAN IN ACCORDANCE WITH DEPARTMENT OF <br />ECOLOGY STORMWATER POLLUTION PREVENTION REQUIREMENTS. IF BMP INSTALLATION AND MAINTENANCE IS INADEQUATE TO MEET <br />THESE REQUIREMENTS CONTRACTOR TO PROVIDE ADDITIONAL BMP'S AT NO ADDITIONAL COST TO OWNER. <br />CODE BMPS <br />PS TEMPORARY 8 PERMANENT SEEDING (D.O.E. BMP C120) IP CATCH BASIN/INLET SEDIMENT PROTECTION <br />(WSDOT STD PLAN 140.20-00 & D.O.E. BMP <br />C220) <br />PRESERVING NATURAL VEGETATION O TEMPORARY SANDBAG BERM <br />(D.O.E. BMP C101) (D.O.E. BMP C200) <br />Cf F CHAIN LINK CONSTRUCTION FENCE SF TEMPORARY SILT FENCE D.O.E. BMP C233) <br />(D.O.E. BMP C103) <br />MULCH (D.O.E. BMP C121) <br />--- LIMIT OF WORK <br />1. CONTRACTOR TO PREPARE THE STORMWATER POLLUTION PREVENTION PLAN(SWPPP) <br />ACCORDING TO THE 2019 STORMWATER MANAGEMENT MANUAL FOR WESTERN <br />WASHINGTON. <br />2. SCHEDULE AND ATTEND PRE -CONSTRUCTION CONFERENCE. CONFERENCE TO INCLUDE <br />THE CONTRACTORS CERTIFIED EROSION CONTROL SPECIALIST (CESCL). <br />3. FIELD STAKE AND FLAG CLEARING LIMITS. <br />4. INSTALL FILTER FABRIC SILT FENCE. <br />5. SUBMIT FOR GRADING PERMIT. <br />6. CLEAR WITHIN FLAGGED CLEARING LIMITS. <br />7. REMOVE TEMPORARY EROSION CONTROL FACILITIES ONLY AFTER ENTIRE SITE IS <br />STABILIZED AND THE POTENTIAL FOR EROSION HAS PASSED. <br />1. OBSERVE EROSION CONTROL MEASURES AT THE BEGINNING AND END OF EACH DAY. <br />,e _ I <br />REPAIR AND/OR REPLACE AS NECESSARY TO ASSURE PROPER FUNCTION. <br />roxi, <br />7" t - - 2 OBSERVE COLLECTION FACILITIES DURING PERIODS OF HEAVY RAINFALL AND WET <br />,V WEATHER CONDITIONS <br />iW �! r I} 3. OBSERVE AND MONITOR STABILIZATION TECHNIQUES MAKE REPAIRS AND/OR <br />I a . ♦' 4 �'+.� ,`�'. I� ALTERATIONS AS NECESSARY TO PREVENT EROSION. <br />n /��i � D Al a., J 4. COMPLY WITH ALL WASHINGTON STATE DEPARTMENT OF ECOLOGY (D.O.E.) AND CITY OF <br />EVERETT C.O.E. REQUIREMENTS FOR EROSION CONTROL. <br />LIMIT OF WORK <br />4 EXISTINGASPHALT ' �k <br />K ENTRANCE <br />4r <br />r rl.EXISTING ASPHALT�— <br />AROAD <br />\ EXISTING ASI ALTT <br />ilk CIF 3 I /ROAD _- <br />SB <br />c4.p i � 1� - -- jI3I� <br />PLANS ISSUED FOR PERMIT SET <br />BID CONST x RECORD <br />ACTION DATE APRVD ACTION DATE APRVD ACTION I DATE APRVD <br />\ ~7 i <br />\ \ 33.00 � <br />EXISTING ASPHALT <br />ROAD— <br />\J <br />00 <'; � <br />_t� <br />0 <br />PLAN <br />SCALE: 1 "— 100' <br />CITY OF EVERETT <br />PARKS AND FACILITIES <br />EVERETT 8°Everett xWA 82° 003 <br />WASHINGTON 435.357.8300 evenMwu.gov <br />SILVER LAKE TRAIL <br />11405 W SILVER LAKE RD <br />1. Approval of this erasion/sedimentation control (ESC) plan does <br />not constitute an approval of permanent road or drainage design (e.g. <br />size and location of roads, pipes, restrictors, channels, retention facilities, <br />utilities). <br />2. The implementation of these ESC plans and the construction, <br />maintenance, replacement, and upgrading of these ESC facilities is the <br />responsibility of the applicant/contractor until all construction is completed <br />and approved and vegetation/landscaping is established. <br />3. The boundaries of the clearing limits shown on this plan shall be <br />clearly flagged in the field prior to construction. During the construction <br />period, no disturbance beyond the flagged clearing limits shall be <br />permitted. The flagging shall be maintained by the applicant/contractor for <br />the duration of construction. <br />4. The ESC facilities shown on this plan must be constructed in <br />conjunction with all Gearing and grading activities, and in such a manner <br />as to ensure that sediment and sediment laden water do not enter the <br />drainage system, roadways, or violate applicable water quality standards. <br />5. The ESC facilities shown on this plan are the minimum <br />requirements for anticipated site conditions. During the construction <br />period, these ESC facilities shall be upgraded as needed for unexpected <br />storm events and to ensure that sediment and sediment -laden water do <br />not leave the site. <br />6. The ESC facilities shall be inspected routinely and maintained by <br />the applicarrUcontractor to ensure their continued functioning, especially <br />after storm events. <br />7. The ESC facilities on inactive sites shall be inspected and <br />maintained a minimum of once a month or within the 48 hours following a <br />major storm event. <br />8. At no time shall more than one foot of sediment be allowed to <br />accumulate within a trapped catch basin. All catch basins and <br />conveyance lines shall be cleaned prior to paving. The cleaning operation <br />shall not flush sediment laden water into the downstream system. <br />9. Stabilized construction entrances shall be installed at the <br />beginning of construction and maintained for the duration of the project. <br />Additional measures may be required to ensure that all paved areas are <br />kept clean for the duration of the project. <br />10. The Contractor shall provide periodic street cleaning to remove <br />debris and sediment tracked off the site. <br />11. Appropriate measures shall be taken to stop sediment from <br />entering surface water bodies if the proposed BMPs fail. If BMPs fail and <br />sediment -laden water is leaving the site, immediately notify your Public <br />Works Inspector. <br />12. Bare and/or disturbed soils shall remain uncovered and/or <br />unstabilized for no more than 2 days from October 1 through April 30, and <br />for no more than 7 days from May 1 through September 30. <br />13. Notify the City Public Works Inspector at least 24 hours prior to <br />dewatering activities. Handle highly turbid or otherwise contaminated <br />dewatering water separately from stormwater. <br />14. The approved project Public Works permit and SWPPP shall be <br />retained on site or readily available to the contractor throughout the <br />duration of the construction project. <br />15. Design, install, implement, and maintain effective pollution <br />prevention measures to minimize the discharge of pollutants. <br />16. Protect all LID BMPs from sedimentation through installation and <br />maintenance of erosion and sediment control BMPs on portions of the <br />site that drain into the LID BMPs. <br />priming <br />C1r1 <br />TEMPORARY EROSION CONTROL PLAN 14 <br />