Laserfiche WebLink
The comments below were generated from this project's Stormwater Reviewers. All questions shall be routed through this project's Public Works Reviewer <br />Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />Geotechnical <br />- <br />TP-7 from the geotech report indicates groundwater at 18 in. <br />Report <br />below grade. It appears that TP-7 is near the proposed <br />permeable pavement on the south end of the trail. BMP T5.15 <br />requires a 1 ft separation to groundwater. <br />2 <br />Stormwater <br />20 <br />Include all construction -related BMPs with MR #2, CSWPPP. <br />Site Plan <br />For MR #3, list all applicable Source Control BMPs from <br />Volume IV in the Manual. <br />3 <br />Operation <br />- <br />Clearly state that the Parks Department will be responsible for <br />and <br />O&M of the permeable pavement. <br />Maintenance <br />Public Works will not accept ownership or maintenance <br />Manual <br />responsibility for permeable pavement. [DCSS 4-4.1(1)] <br />4 <br />Civil Plans <br />C1.1 <br />Add COE TESC notes from Design and Construction <br />Standards and Specification, Chapter 2-5. <br />5 <br />Civil Plans <br />C4.1 <br />Include DCSS Standard Drawing 431 for check dams where the <br />permeable pavement longitudinal slope is >2%. <br />Pale 2 of 2 <br />