Laserfiche WebLink
CONTRACTOR TO INSTALL AND MAINTAIN ALL EROSION CONTROL BMPS AS SHOWN ON THIS PLAN IN ACCORDANCE WITH DEPARTMENT OF <br />ECOLOGY STORMWATER POLLUTION PREVENTION REQUIREMENTS. IF BMP INSTALLATION AND MAINTENANCE IS INADEQUATE TO MEET <br />THESE REQUIREMENTS CONTRACTOR TO PROVIDE ADDITIONAL BMP'S AT NO ADDITIONAL COST TO OWNER. <br />CODE <br />PS <br />Cf_F <br />TEMPORARY & PERMANENT SEEDING (D.O.E. BMP C120) <br />PRESERVING NATURAL VEGETATION <br />(D.O.E. BMP C101) <br />CHAIN LINK CONSTRUCTION FENCE <br />(D.O.E. BMP C103) <br />CATCH BASIN/INLET SEDIMENT PROTECTION <br />(WSDOT STD PLAN 140.20-00 & D.O.E. BMP <br />C220) <br />TEMPORARY SANDBAG BERM <br />(D.O.E. BMP C200) <br />TEMPORARY SILT FENCE D.O.E. BMP C233) <br />LIMIT OF WORK <br />I- EXISTING ASPHALT <br />AmROAD <br />\ EXISTING ASPHAUT- <br />ilk CIF eO I /ROAb _- <br />S$ <br />c4.0 <br />PLANS ISSUED FOR PERMIT SET <br />BID CONST x RECORD <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />MULCH (D.O.E. BMP C121) <br />% <br />\ 3 0 <br />ry �3*O0 � <br />EXISTING ASP-T <br />ROAD- <br />os <br />PLAN <br />SCALE: 1 "- 100' <br />CITY OF EVERETT <br />PARKS AND FACILITIES <br />EVERETT 8°Everett XWa 82° 003 <br />WASHINGTON 435.357.8300 ever ..gov <br />1V C♦ F <br />La <br />SILVER LAKE TRAIL <br />11405 W SILVER LAKE RD <br />1. CONTRACTOR TO PREPARE THE STORMWATER POLLUTION PREVENTION PLAN(SWPPP) <br />ACCORDING TO THE 2019 STORMWATER MANAGEMENT MANUAL FOR WESTERN <br />WASHINGTON. <br />2. SCHEDULE AND ATTEND PRE -CONSTRUCTION CONFERENCE. CONFERENCE TO INCLUDE <br />THE CONTRACTORS CERTIFIED EROSION CONTROL SPECIALIST (CESCL). <br />3. FIELD STAKE AND FLAG CLEARING LIMITS. <br />4. INSTALL FILTER FABRIC SILT FENCE. <br />5. SUBMIT FOR GRADING PERMIT. <br />6. CLEAR WITHIN FLAGGED CLEARING LIMITS. <br />7. REMOVE TEMPORARY EROSION CONTROL FACILITIES ONLY AFTER ENTIRE SITE IS <br />STABILIZED AND THE POTENTIAL FOR EROSION HAS PASSED. <br />1. OBSERVE EROSION CONTROL MEASURES AT THE BEGINNING AND END OF EACH DAY. <br />REPAIR AND/OR REPLACE AS NECESSARY TO ASSURE PROPER FUNCTION. <br />2. OBSERVE COLLECTION FACILITIES DURING PERIODS OF HEAVY RAINFALL AND WET <br />WEATHER CONDITIONS. <br />3. OBSERVE AND MONITOR STABILIZATION TECHNIQUES. MAKE REPAIRS AND/OR <br />ALTERATIONS AS NECESSARY TO PREVENT EROSION. <br />4. COMPLY WITH ALL WASHINGTON STATE DEPARTMENT OF ECOLOGY (D.O.E.) AND CITY OF <br />EVERETT (C.O.E.) REQUIREMENTS FOR EROSION CONTROL. <br />TESC STANDARD NOTES <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (TESC) PLAN DOES NOT <br />CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND <br />LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, <br />UTILITIES). <br />2. THE IMPLEMENTATION OF THIS TESC PLAN AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE TESC BMPS IS THE RESPONSIBILITY OF THE <br />CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATIONMNDSCAPING IS ESTABLISHED. <br />3. CONSTRUCT THE TESC BMPS SHOWN ON THIS PLAN IN CONJUNCTION WITH ALL <br />CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT <br />SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE LAKE OR VIOLATE <br />APPLICABLE WATER STANDARDS. <br />4. THE TESC BMPS SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, UPGRADE THESE <br />TESC BMPS AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />5. THE CONTRACTOR SHALL INSPECT THE TESC BMPS DAILY AND MAINTAIN THEM AS <br />NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. <br />6. INSPECT AND MAINTAIN THE TESC BMPS ON INACTIVE SITES A MINIMUM OF ONCE A <br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT (I.E. A 24-HOUR <br />STORM EVENT WITH A 10-YR OR GREATER RECURRENCE INTERVAL). <br />Drzwing <br />C1.1 <br />TEMPORARY EROSION CONTROL PLAN 4 22 <br />Of Total <br />