Laserfiche WebLink
City of Everett 00 7200 - 25 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 7200 - 25 GENERAL CONDITIONS <br />Contractor and all of its Subcontractors shall submit affidavits of wages paid to the Department of Labor <br />and Industries in such form as may be required by said Department. Payment of the retained percentage <br />will not be made until certification is received from the Department of Labor and Industries that the <br />prevailing wage requirements of state law have been satisfied. <br />B. Any fees charged by the Department of Labor and Industries for filing such statements or <br />submitting such affidavits shall be the responsibility of the Contractor, and each Subcontractor; if, for any <br />reason, the Owner pays such fees, then the Contractor shall be charged the amounts thereof. <br />C. Unless otherwise determined by Owner, the Owner will require payroll reports for the Contractor <br />and every Subcontractor be submitted weekly to the Construction Division, Public Works Annex, 3101 <br />Cedar Street, Everett, Washington 98201. The payroll reports shall contain the following information: <br />1. Name and residence address of each worker. <br />2. Social Security number of each worker. <br />3. Classification of work performed by each worker. The classification shall be specific and <br />match the classification categories listed in the Contract Documents. <br />4. Total number of hours employed each day. <br />5. Total number of hours employed during the payroll period. <br />6. Straight time and overtime hourly rate of wages paid to each worker. <br />7. Total or gross amount earned by each worker. <br />8. Deductions for Medical Aid, FICA, Federal withholding tax, and any other deductions <br />taken. <br />9. Net amount paid each worker. <br />10. Contractor's, or Subcontractor's, name and address. <br />11. Days and dates worked. <br />12. Date of final day of pay period. <br />13. Whether fringe benefits were paid to each worker as part of the hourly wage rate or <br />whether fringe benefits were paid into an approved plan, fund, or program. <br />Payrolls may be submitted on Federal payroll form WH-347, or equivalent. The reverse side of the form <br />contains an affidavit that shall be filled out and signed. If the Contractor's payroll reports are <br />computerized, the computerized reports may be submitted along with a Statement of Compliance affidavit <br />photo copied from the back of form WH-347, or equivalent. <br />The first payroll submitted for the Work for both the Contractor and each Subcontractor shall be labeled <br />"Initial.” The last payroll submitted for the Work for both the Contractor and each Subcontractor shall be <br />labeled "Final.” Payrolls shall be sequentially numbered for all periods in which Work has been done. A <br />certificate of completion for the Work, signed by the City, will constitute acceptance of the Work. The <br />issuance of this certificate of completion will not constitute acceptance of unauthorized or defective Work <br />or material is performed. <br />7.3. HOURS OF LABOR <br />Contractor shall comply with all applicable laws and regulations regarding hours of work, including, but <br />not limited to, RCW Chap. 49.28. <br />7.4. CONTRACT WORK HOURS <br />The Contractor shall comply with Section 103 of the Contract Work Hours and Safety Standards Act (40 <br />U.S.C. section 327-330) as supplemented by Department of Labor Regulations (29 CFR, Part 5). Under <br />this section the Contractor shall compute the wages of every mechanic and laborer on the basis of a