My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 41 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 7200 - 41 GENERAL CONDITIONS <br />risks in connection with the investment of the retained percentages in securities. The City may also, at its <br />option, accept a bond in lieu of retainage. <br />Retainage will be released when all of the following conditions are satisfied: <br />1. Sixty (60) days have elapsed following the completion of all Work specified in the Contract; and <br />2. The Contractor fulfilled all of all obligations of the Contractor under the Contract, including, but <br />not limited to, the Contractor’s furnishing all documentation required by Contract and law; and <br />3. A release has been obtained from the Washington State Department of Revenue; and <br />4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file with the Owner <br />(RCW 39.12.040); and <br />5. A release has been obtained from the Washington State Department of Labor & Industries and the <br />Washington State Employment Security Department; and <br />6. All claims, as provided by law, filed against the retainage have been resolved. In the event claims <br />are filed and provided the conditions one through five are met, the Contractor will be paid the <br />retained percentage less an amount sufficient to pay any such claims together with a sum <br />determined by the Owner sufficient to pay the cost of claims and attorney’s fees. <br />7. All other conditions required by law are satisfied. <br />10. NOTICE TO OWNER <br />10.1 WHEN NOTICE MUST BE GIVEN <br />Whenever <br />1. The Contractor disagrees with any requirement, direction, interpretation or determination by the <br />Owner or Owner’s Representative; <br />2. The Contractor knows, or should with the reasonable exercise of ordinary care know, of a <br />differing site condition as provided in 11. DIFFERING SITE CONDITIONS; <br />3. The Contractor knows, or should with the reasonable exercise of ordinary care know, of any <br />Delay or an event that may cause a Delay; <br />4. The Contractor believes, or with the reasonable exercise of ordinary care should believe, it is <br />entitled to an adjustment of Contract Sum or Time, even if the total or exact amount or impact <br />cannot yet be determined; <br />5. The Contractor believes it is required or directed to perform work that is outside the scope of the <br />Contract Documents; or <br />6. An event occurs, or fails to occur, that the Contractor believes, or should reasonably foresee, may <br />result in a Contract Claim; <br />the Contractor shall immediately give Notice to the Owner or Owner’s Representative as provided in this <br />section and elsewhere in the General Conditions and Specifications. <br />Timely and adequate Notice is a condition precedent to a Contract Claim. <br />Requests for extensions of Contract Time must be made and will be evaluated in accordance with 5.2.2.2 <br />Extensions of Contract Time. <br />Irrespective of any request for additional compensation or Contract Time or any Contract Claim that work <br />is extra and not part of the original scope of Work, the Contractor shall proceed expeditiously and <br />promptly with the work as the Owner orders. <br />If the Contractor fails to follow the procedures of this Contract, including failing to give Notice, the <br />Contractor completely waives such Contract Claim. In its sole discretion, the Owner may waive strict
The URL can be used to link to this page
Your browser does not support the video tag.