My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 45 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 7200 - 45 GENERAL CONDITIONS <br />v. Overhead (general and administrative). <br />vi. Subcontractor’s contract claims (in the same level of detail as specified herein is <br />required for all Subcontractor’s contract claims); and <br />vii. Other categories as specified by the Contractor or the Owner. <br />10. A notarized statement shall be submitted to the Owner's Representative containing the following <br />language: <br />Under the penalty of law for perjury or falsification, the undersigned, <br /> <br />______________________________, ______________________________ <br /> (name) (title) <br />of ____________________________________________________________ <br /> (company) <br />hereby certifies that the Contract Claim for an adjustment to the Contract Sum and/or <br />Contract Time, if any, made herein for Work on this Contract is a true and complete <br />statement of the factual basis of the Contract Claim and all actual costs incurred and time <br />sought, and is fully documented and supported under the Contract between the parties. <br />Date________________________________/s/ _______________________ <br />Subscribed and sworn before me this ____________ day of _______ <br />Notary Public <br />My Commission Expires: ___________________________________________ <br />12.3 FALSE OR OMITTED INFORMATION <br />The Contractor waives each Contract Claim for which it presents material information that it knows, or in <br />the exercise of reasonable care should know, is false, or omits or fails to disclose material information <br />relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees <br />and expenses incurred in investigating any such Contract Claim. <br />12.4 REMEDIES <br />12.4.1 General <br />If a Contract Claim has merit in whole or in part, then Contractor’s sole remedies shall be those provided <br />in this subsection. Contractor must timely and strictly comply with the requirements of 10. NOTICE TO <br />OWNER, 11. DIFFERING SITE CONDITIONS, 12. CONTRACT CLAIMS and all other General <br />Conditions relating to the Contract Claim. Adjustments to Contract Time shall be determined pursuant to <br />5.2.2.2 Extensions of Contract Time. Failure to comply strictly and timely shall be deemed a waiver of <br />the Contract Claim. <br />12.4.2 Extra Work <br />12.4.2.1 Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, the adjustment shall <br />be calculated and paid as provided in 9.5. ADJUSTMENT OF CONTRACT SUM. This amount <br />includes jobsite and home office Overheads for such Work, including any schedule delays relating to such <br />Work. Therefore, no compensation in addition to that provided in 9.6. FORCE ACCOUNT shall be <br />paid for such things as extended Overhead or other costs or damages.
The URL can be used to link to this page
Your browser does not support the video tag.