My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 2213 - 1 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 2213 - 1 UNIT PRICE MEASUREMENT <br />SECTION 01 2213 – MEASUREMENT AND PAYMENT <br /> <br />1.1 SUMMARY <br /> <br />A. Unit price bid items measured in tons must be weighed and tested for solids <br />content and submitted to the Project Manager prior to or concurrent with any <br />application for payment. Solids Content will be taken by the City to verify <br />numbers. The allowable minimum solids content of any material loaded into a <br />truck for weighing and transportation shall be 28% Total Solids (TS) on the <br />Biosolids Pad. <br /> <br />1.2 REFERENCES <br /> <br />A. Section 00 7200 – GENERAL CONDITIONS 1.1 DEFINITIONS OF WORDS <br />AND TERMS: <br />1. DRY WEIGHT <br />2. DRY TON <br />3. TOTAL SOLIDS <br /> <br />B. Section 01 4523 – MATERIAL SAMPLING <br /> <br />1.3 BID ITEMS <br /> <br />A. Item #1- MOBILIZATION AND DEMOBILIZATION (Lump Sum) <br /> <br />1. The lump sum price Mobilization and Demobilization shall encompass full <br />compensation for the Work consisting of the preparatory work and <br />operations in mobilizing for beginning the Work in the Contract, including, <br />but not limited to, movement of those personnel, equipment, supplies, and <br />incidentals to the project sites, preparation of submittals and for the <br />establishment of temporary offices, phone service, equipment, first aid <br />supplies, field surveys, sanitation needs, and all other facilities for both sites <br />as required by these specifications and State and local laws and <br />regulations. The costs of bonds, permits, any required insurance, and any <br />other preconstruction expense necessary for the start of the Work shall also <br />be included. This Work also consists of the general project management of <br />the Work including, but not limited to, field supervision and office <br />management, as well as other incidental cost for management of the Work <br />during the duration of the Contract. This lump sum price shall not exceed 10% of <br />the total of all bid items. <br /> <br />2. Payment <br /> <br />a. When 5% of the original Contract amount is earned from other bid
The URL can be used to link to this page
Your browser does not support the video tag.