Laserfiche WebLink
City of Everett 01 2213 - 1 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 2213 - 1 UNIT PRICE MEASUREMENT <br />SECTION 01 2213 – MEASUREMENT AND PAYMENT <br /> <br />1.1 SUMMARY <br /> <br />A. Unit price bid items measured in tons must be weighed and tested for solids <br />content and submitted to the Project Manager prior to or concurrent with any <br />application for payment. Solids Content will be taken by the City to verify <br />numbers. The allowable minimum solids content of any material loaded into a <br />truck for weighing and transportation shall be 28% Total Solids (TS) on the <br />Biosolids Pad. <br /> <br />1.2 REFERENCES <br /> <br />A. Section 00 7200 – GENERAL CONDITIONS 1.1 DEFINITIONS OF WORDS <br />AND TERMS: <br />1. DRY WEIGHT <br />2. DRY TON <br />3. TOTAL SOLIDS <br /> <br />B. Section 01 4523 – MATERIAL SAMPLING <br /> <br />1.3 BID ITEMS <br /> <br />A. Item #1- MOBILIZATION AND DEMOBILIZATION (Lump Sum) <br /> <br />1. The lump sum price Mobilization and Demobilization shall encompass full <br />compensation for the Work consisting of the preparatory work and <br />operations in mobilizing for beginning the Work in the Contract, including, <br />but not limited to, movement of those personnel, equipment, supplies, and <br />incidentals to the project sites, preparation of submittals and for the <br />establishment of temporary offices, phone service, equipment, first aid <br />supplies, field surveys, sanitation needs, and all other facilities for both sites <br />as required by these specifications and State and local laws and <br />regulations. The costs of bonds, permits, any required insurance, and any <br />other preconstruction expense necessary for the start of the Work shall also <br />be included. This Work also consists of the general project management of <br />the Work including, but not limited to, field supervision and office <br />management, as well as other incidental cost for management of the Work <br />during the duration of the Contract. This lump sum price shall not exceed 10% of <br />the total of all bid items. <br /> <br />2. Payment <br /> <br />a. When 5% of the original Contract amount is earned from other bid