My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 2213 - 3 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 2213 - 3 UNIT PRICE MEASUREMENT <br /> <br />5. Payment <br /> <br />a. All labor, equipment, tools, materials, and necessary appurtenances <br />required to dredge the biosolids from Aeration Cell #2 and necessary <br />to dewater these biosolids to a solids content of equal to or greater <br />than 28% TS shall be incidental to the payment for each Dry Ton. <br /> <br />b. Payment for labor, equipment, tools, and materials necessary for <br />loading, moving, weighing, transporting, and depositing the material in <br />the designated area on the City’s Biosolids Pad shall also be incidental <br />to the payment for each Dry Ton. <br /> <br />c. Contractor shall provide a composite sample from each truckload <br />hauled across the scale. Individual truck samples taken will be <br />combined by the City on a daily basis to form a daily composite <br />sample, which will be tested to determine the average percent solids <br />for the day. This average percentage shall be applied to the daily total <br />truck weights for payment. The average percent solids amount from <br />the composite sample must be a minimum of 28%. See Section 01 <br />4523 for full sampling requirements. <br /> <br />d. The City reserves the right to test individual truck samples for percent <br />solids and apply this percentage to the individual truck weight for <br />payment. <br /> <br />e. Contractor is responsible for submitting empty truck scale tickets, full <br />truck scale tickets, and samples from each truckload the next business <br />day after they have been collected. <br /> <br />f. Owner reserves the right to reject applications for payment if: <br />1) Submittal of scale tickets and sample data are not submitted in <br />a timely manner. <br />2) Total Solids of any mass of biosolids fails to meet the minimum <br />specifications. <br /> <br /> <br />D. Item #5 – FORCE ACCOUNT FOR WORK AT WPCF <br /> <br />1. Measurement will be negotiated prior to commencing any such work under <br />this pay item and shall be for work to remedy unforeseen conditions. <br /> <br />2. Payment or credits for changes amounting to $10,000 or less may be made <br />under the Bid Item FORCE ACCOUNT. At the discretion of the City, this <br />procedure for Force Account may be used in lieu of the more formal <br />procedure outlined in the General Conditions 00 7200, Section 9.6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.