My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 2600 - 2 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 2600 - 2 CONTRACT MODIFICATION PROCEDURES <br /> <br />B. When requested, the Contractor shall provide pricing per 1.1 of this section for <br />review and approval by the Owner, prior to proceeding with the work. <br /> <br />1.4 CHANGE ORDERS <br /> <br />A. A change order to the work will be issued including one or more Request for <br />Change Proposals. The cumulative amount of adds and deducts along with the <br />change in the number of days approved in each individual RFCP shall be added <br />to or deducted from the Contract. The change order shall incorporate the RFCP <br />forms, and all required back up documentation into a lump sum contract <br />adjustment. <br /> <br />B. The payment for work performed under the change order cannot be made until <br />the change order has been signed and approved as per 00 7200 General <br />Condition, Article 6. <br /> <br />C. If an individual change order exceeds 10% of the original contract amount and is <br />over $50,000, a special review may be required by the Owner. <br /> <br /> <br />END OF SECTION 01 2600
The URL can be used to link to this page
Your browser does not support the video tag.