My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 2973 - 2 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 2973- 2 SCHEDULE OF VALUES <br />2. Application for Payment forms, including Continuation Sheets. Correlate <br />Schedule of Values line items to that listed by Application for Payment: <br /> <br />a. Correspond to indirect costs and margins on actual cost. <br />b. Make amounts for total coast and overhead and profit complete and <br />proportionate. <br />c. Include overhead and profit as a single line item. <br /> <br />3. List of subcontractors. <br />4. List of principal suppliers and fabricators. <br />5. Schedule of submittals and list of products. <br /> <br />C. Use as basis for determining dollar value amount for each work activity and <br />component of work for duration of Project. <br /> <br />D. Make Schedule of Values total sum equal to current Contract Sum. <br /> <br />E. Round-off figures to nearest dollar amount. <br /> <br />F. Identify Schedule of Value line items by corresponding Section Titles in Project <br />Manual Table of Contents. <br /> <br />G. Break down major portion of work by areas, disciplines, phase, systems, or as <br />appropriate for ease of review. <br /> <br />H. For work that exceeds 1.0 percent of Contract Sum, break out separate line <br />items according to major work activities, components, products, or operations. <br /> <br />1.5 CONTENT <br /> <br />A. Identification: Include the following Project identification on the <br />Schedule of Values: <br /> <br />1. Project name and location. <br />2. City's name. <br />3. Project number. <br />4. Contractor's name and address. <br />5. Date of original submittal. <br />6. Date of revised submittals. <br /> <br />B. Work Activities: Indicate Cost Values for labor, material, equipment, and <br />Contractor's overhead and profit, and Total Cost Value for each line item. <br /> <br />1. Distribute Contractor’s office overhead and profit proportionally among <br />allocated cost for each work activity. <br />2. Costs associated with ongoing mobilization activities can be listed <br />separately or distributed evenly among allocated cost for each work
The URL can be used to link to this page
Your browser does not support the video tag.