My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 2113 - 10 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 2113 - 10 INSTRUCTIONS TO BIDDERS <br />Bidder determined to be not responsible has received the City’s final <br />determination. <br />If the Contract Documents contain supplemental responsibility criteria, then a <br />Bidder will be deemed not responsible if the Bidder does not meet those criteria, <br />all as set forth in SECTION 00 2213, SUPPLEMENTAL INSTRUCTIONS TO <br />BIDDERS. <br /> <br />1-02.15 Pre-Award Information <br />Before awarding any contract, the City may require one or more of these items <br />or actions of the apparent lowest responsible Bidder: <br />1. A complete statement of the origin, composition, and manufacture of <br />any or all materials to be used, <br />2. Samples of these materials for quality and fitness tests, <br />3. A progress schedule, in a form the City requires, showing the order of <br />and time required for the various phases of the Work, <br />4. A breakdown of costs assigned to any bid item, <br />5. Attendance at a conference with the Engineer or representatives of the <br />Engineer, <br />6. Obtain, and furnish a copy of, a business license to do business in the <br />City of Everett. <br />7. A copy of State of Washington Contractor’s Registration, or <br />8. Any other information or action taken that is deemed necessary to <br />ensure that the Bidder is the lowest responsible bidder. <br />After Bid opening, but prior to award, the apparent successful Bidder shall, if <br />requested by the City, attend a pre-award conference to respond to questions by <br />the City regarding evaluation of Bids. The City will emphasize items such as <br />insurance and bonding that will assist in prompt issuance of the Notice to <br />Proceed. By conducting a pre-award conference, the City has not thereby <br />waived its right to make determinations regarding responsiveness and <br />responsibility of the Bidder. <br /> <br />1-03 AWARD AND EXECUTION OF CONTRACT <br />1-03.1 Consideration of Bids <br />Bids will be evaluated by the City to determine which bid is the lowest responsive <br />bid by a responsible bidder and which bid, if any, should be accepted in the best <br />interest of the City. The right is reserved by the City to waive informalities in the <br />bidding, accept a Bid of the lowest responsible Bidder, reject any or all Bids, <br />republish the call for Bids, revise or cancel the Work, or require the Work to be <br />done in another way if the best interest of the City is served. <br />Within 5 days after the opening of Bids (or such longer time as the City may grant <br />in writing), a Bidder who wishes to claim error shall submit a notarized affidavit <br />signed by the Bidder, accompanied by original work sheets used in the preparation
The URL can be used to link to this page
Your browser does not support the video tag.