My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 2513 - 1 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 2513 - 1 PRE-BID MEETING <br />SECTION 00 2513 - PRE-BID MEETING <br />1.1 SUMMARY <br />A. Two pre-bid meetings will be held to discuss the project. Attendance of at least <br />one of the pre-bid meetings is mandatory for all prospective bidders. At these <br />meetings the items on the Agenda will be covered (see 1.5 AGENDA). The <br />meetings will include a site walk of the WPCF Biosolids Pad. <br />B. Each Bidder must sign the sign-in sheet at the meeting. <br />C. Attendance at a pre-bid meeting is one of the supplemental responsibility criteria <br />under Supplemental Instructions to Bidders (Section 00 4513). A Bid received <br />from a Bidder who did not attend one pre-bid meeting and sign the sign-in sheet <br />will be found not responsible and the bid will be rejected. <br />1.2 DATE <br />A. Meeting 1 - September 21st, 2023 <br />B. Meeting 2 – September 26th, 2023 <br />1.3 LOCATION <br />A. The meeting place will be at the WPCF site: 4027 4th Street SE, Everett WA. <br />1.4 TIME <br />A. On September 21st, the meeting/site visit will start promptly at 10:30 a.m. <br />B. On September 26th, the meeting/site visit will start promptly at 10:30 a.m. <br />1.5 AGENDA <br />A. Review Scope of Project <br />B. Review required documents to be submitted with the Bid Form <br />C. Bid Due Date <br />D. Review Scope of Work <br />E. Review Addendums to date
The URL can be used to link to this page
Your browser does not support the video tag.