My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 4336 - 1 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 4336 - 1 PROPOSED SUBCONTRACTORS FORM <br /> <br />SECTION 00 4336 - PROPOSED SUBCONTRACTORS FORM <br />1. For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br />18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel <br />installation and rebar installation, Bidder MUST either identify itself or <br />Subcontractors in the chart below. If Bidder believes such work is not part of the <br />Work, Bidder shall write “NO WORK”. <br />2. Bidder shall not list more than one Subcontractor for each category of Work <br />identified, unless Subcontractors vary with Bid alternates, in which case the Bidder <br />must indicate which Subcontractor will be used for which alternate. <br />3. Bidder’s Bid shall be deemed non-responsive and void if: <br />A. For heating, ventilation and air conditioning, plumbing, electrical work, <br />structural steel installation and rebar installation, Bidder fails: (1) to submit <br />as part of the Bid the names of such Subcontractors; (2) to name itself to <br />perform such Work; or (3) to write “No Work”; or <br />B. Bidder names two or more Subcontractors to perform the same Work. <br />4. The requirement to name the Bidder's proposed heating, ventilation, air <br />conditioning, plumbing, electrical, structural steel installation and rebar installation <br />subcontractors applies only to proposed heating, ventilation, air conditioning, <br />plumbing, electrical, structural steel installation and rebar installation <br />subcontractors who will contract directly with the general contractor submitting the <br />Bid to the City. <br />5. The heating, ventilation and air conditioning, plumbing, and electrical portions of the chart below must be submitted with the bid proposal or within one hour of the published bid submittal time. <br />6. The structural steel installation and rebar installation portions of the chart below must be submitted with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> <br /> <br />The remainder of this page is intentionally left blank <br />
The URL can be used to link to this page
Your browser does not support the video tag.