Laserfiche WebLink
City of Everett 00 7200 - 5 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 7200 - 5 GENERAL CONDITIONS <br />Total Float: The amount of time any given activity or path of activities may be delayed before it will <br />affect the Completion Date. <br />Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br />equestrian traffic. <br />Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor’s Overhead <br />costs realized by the result of reduced Project or Contractor billings, or both, due to any reason <br />whatsoever, including a Project extension. <br />Unit Price Work: Refers to items of Work identified by unit prices in the Bid form. <br />Work: Refers to the Project and the provision of all labor, materials, Equipment, supplies, services, and <br />other items necessary for the execution, completion and fulfillment of the Contract. <br />1.2. CONTRACT DOCUMENTS <br />The complete Contract includes the following, which are Contract Documents: <br />1. Federal and state requirements that apply to this Contract and Project; <br />2. Supplemental agreements between Owner and Contractor, if any, subsequent to the Owner’s <br />execution of the Contract and signed by the Mayor of the City of Everett for Owner and by an <br />authorized representative of Contractor <br />3. Change Orders; <br />4. Addenda; <br />5. The Contract; <br />6. Bid Form; <br />7. Specifications, including, but not limited to, these General Conditions and other numbered <br />Documents and Sections; <br />8. Supplementary Conditions, if any; <br />9. Drawings and plans; <br />10. City of Everett standard plans in effect as of the date Bids are opened; <br />11. Notice to Bidders/Instructions to Bidders; and <br />12. Certifications and affidavits as required by this Contract and by law. <br />Any inconsistency in the parts of the Contract shall be resolved by following this order of precedence in <br />the list above (e.g., 1 presiding over 2, 3, 4, 5, and 6; 2 presiding over 3, 4, 5, and 6; and so forth). This <br />order of precedence shall not apply when Work is required by one part of the Contract but omitted from <br />another part or parts of the Contract. The Work required in one part must be furnished even if not <br />mentioned in other parts of the Contract. <br />These parts complement each other in describing the complete Work. Any requirement in one part binds <br />as if stated in all parts. The Contractor shall provide any work or materials clearly implied in the Contract <br />even if the Contract does not mention it specifically. Any inconsistency in the parts of the Contract shall <br />be referred to the Owner’s Representative attention for a determination of the intended requirements. <br />The Work required in one part must be furnished even if not mentioned in other parts of the Contract. If <br />any part of the Contract requires Work that does not include a description for how the Work is to be <br />performed, the Work shall be performed in accordance with standard trade practice(s). For purposes of <br />the Contract, a standard trade practice is one having such regularity of observance in the trade as to justify <br />an expectation that the Contractor will follow or observe the practice in performing the Work. In case of <br />any ambiguity, disagreement or Dispute over interpreting the Contract, the Owner’s Representative’s <br />decision will be final as provided in these General Conditions.