City of Everett 00 7200 - 8 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 7200 - 8 GENERAL CONDITIONS <br />2.3.3.2 Known Utilities <br />The Contractor shall provide at its sole expense all labor, equipment, materials and services necessary to <br />remove, relocate, or maintain utilities specified on the Drawings. The work on each utility shall be <br />performed in a manner satisfactory to the utility owner. The utility owner has the option of doing such <br />work with its own forces at the Contractor's expense, or permitting the work to be performed by the <br />Contractor. <br />2.3.3.3 Service Connections <br />Locations of service connections are not identified on the Drawings. The Contractor shall provide at its <br />sole expense all labor, equipment and material to remove, relocate or maintain service connections. Work <br />on service connections shall be performed in a manner satisfactory to the service connection owner. The <br />service connection owner has the option of doing such work with its own force at the Contractor's <br />expense, or permitting the work to be performed by the Contractor. <br />2.3.3.4 Unknown Utilities <br />When a utility interferes with the Work and is either (1) not identified on the Drawings or (2) located in a <br />position significantly different from that specified on the Drawings, Contractor shall follow the <br />procedures of ARTICLE 11. DIFFERING SITE CONDITIONS. Interference with the Work is <br />defined as a utility that crosses or projects into the plane of the Work at an elevation between the top and <br />bottom of the Work. If it is necessary to remove, relocate, or temporarily maintain the utility, that work <br />shall be included in a Change Order. The utility owner has the option of doing such work or permitting <br />the work to be performed by the Contractor. In either case, the cost of the work incurred by or charged to <br />the Contractor will be included in a Change Order. <br />2.4. SUBMITTALS <br />Where required by the Contract Documents, the Contractor shall submit information which will enable <br />the Owner’s Representative to advise the Owner whether the Contractor's proposed materials, Equipment <br />or methods of work are in general conformance to the design concept and in compliance with the <br />Drawings and Specifications, such as catalog cuts and shop, working or detail drawings. In its <br />Submittals, the Contractor shall expressly and explicitly notify the Owner’s Representative of any and all <br />deviations from the Specifications. Without express and explicit Notice of a deviation from the Contract <br />requirements, approval of a Submittal does not relieve Contractor from complying with Contract <br />requirements. The Owner’s approval of a Submittal does not constitute a waiver of the Contract <br />requirements. The Owner or Owner’s Representative shall respond to a Submittal within thirty (30) days <br />of receipt. The Owner or Owner’s Representative may extend this time for good cause by notifying the <br />Contractor. The Owner will not be obligated to accept or pay for Work performed by the Contractor that <br />may be affected by materials, Equipment, or methods of work not submitted in a timely manner so that <br />final review can be accomplished before the affected Work is complete. The Owner shall not be <br />responsible for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part by <br />Contractor’s failure to submit required information in sufficient time for review, comment, and <br />correction. Contractor’s failure to submit required information in sufficient time for review, comment <br />and correction shall be deemed a waiver of any and all Contract Claims for adjustment of Contract Sum <br />or Contract Time arising out of, or related to, such a Submittal. Contractor acknowledges and agrees that <br />it may not rely upon receiving the Owner’s response to a Submittal in less than thirty (30) days, unless the <br />Owner explicitly changes this section by a signed Change Order. Requests for information or <br />clarification from the Contractor to the Owner shall be treated as a Submittal. <br />2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br />The Contractor shall keep at the construction site at least one set of Contract Documents and one set of <br />full-size Drawings that shall be available to the Owner’s Representative and Owner.