Laserfiche WebLink
Task 3: Attach Project Specific Stormwater Site Plan Drawings (required) <br />4D See City of Everett standard drawings # 100-104 for stormwater site plan requirements and <br />examples, including a Temporary Erosion & Sediment Control (TESC) plan drawing <br />example and drainage plan drawing example, available online <br />at:everettwa.gov/DocumentCenter/View/7040 <br />Task 4: Attach Topographic Survey (if applicable) <br />do A topographic survey prepared by a registered land surveyor, civil engineer or other <br />qualified professional is required if your project site includes steep slopes, critical areas, <br />flood or geologic hazards or at the discretion of the stormwater reviewer. <br />Task 5: Attach Declaration of Covenant <br />To ensure future maintenance and allow access for inspection, any development <br />rw project which constructs stormwater facilities must have a Declaration of Covenant. <br />Fill out and attach the Declaration of Covenant. For a copy, click on the Permitting <br />Resources tab at everettwa.gov/ 1985/Stormwater-Technical-Resources. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area -April 2021 <br />