Laserfiche WebLink
Element 3. Control flow rates: <br />❑ BMP C203: Water Bars <br />❑ BMP C240: Sediment Trap <br />❑ BMP C241: Temporary Sediment Pond <br />❑ Other Per the SWMMWW: <br />N Not applicable to my proposed project <br />Explain: <br />Element 4. Install sediment controls: <br />❑ BMP C231: Brush Barrier <br />❑ BMP C232: Gravel Filter Berm <br />❑ BMP C233:Silt Fence <br />• BMP C234: Vegetated Strip <br />e BMP C235: Wattles <br />❑ BMP C240: Sediment Trap <br />❑ BMP C241: Temporary Sediment Pond <br />❑ Other Per the SWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />Element 5. Stabilize soils: <br />❑ BMP C 120: Temporary and Permanent Seeding <br />❑ BMP C 121: Mulching <br />❑ BMP C 122: Nets and Blankets <br />H BMP C 123: Plastic Covering <br />❑ BMP C 124: Sodding <br />❑ BMP C 125:Topsoil ing/Composting <br />❑ BMP C 126: Polyacrylamide for Soil Erosion Protection <br />❑ BMP C 130: Surface Roughening <br />❑ BMP C 131: Gradient Terraces <br />❑ Other Per the SWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in 11 <br />the Combined Sewer Area -April 2021 <br />