Laserfiche WebLink
0 <br />DONE! <br />You have now completed the Small Project Stormwater Report. <br />Please review any sections you may have skipped to ensure all areas have been completed. <br />Ensure the following attachments have been added: <br />iR Project Specific Stormwater Site Plan <br />8 Topographic Survey <br />❑ Declaration of Covenant and Grant of Easement <br />® Construction SWPPP Drawings <br />❑ Underground Injection Well (UIC) Registration` <br />* You may need to register with the Washington State Department of Ecology at least 60 <br />days prior to commencing UIC Construction. For more information, visit: <br />everettwa. gov/1985/Stormwater-Technical-Resources <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in 22 <br />the Combined Sewer Area -April 2021 <br />