Laserfiche WebLink
- - <br />Section <br /># <br />i Final Inspection Provisions <br />Plans Verified <br />& Req.ID <br />; <br />I Value <br />402.1.1, <br />Ceiling insulation R-value. Where <br />R- <br />402.2.1, <br />> R-30 is required, R-30 can be <br />❑ Wood <br />402.2.2 <br />used if insulation is not <br />❑ Steel <br />[FI1]1 <br />compressed at eaves. R-30 may <br />4� <br />be used for 500 ftz or 20% <br />- <br />(whichever is less) where <br />sufficient space is not available. <br />303.1.1.1, <br />Ceiling insulation installed per <br />303.2 <br />manufacturer's instructions. <br />[F12]1 <br />Blown insulation marked every <br />300 ft2. <br />402.2.3 <br />Attic access hatch and door <br />R- <br />[F13]1 <br />insulation >_R-value of the <br />b <br />adjacent assembly. <br />Field Verified <br />Value Complies? ! Comments/Assumptions <br />R- ❑Complies See the Envelope Assemblies <br />❑ Wood ❑Does Not table for values. <br />❑ Steel ❑Not Observable <br />❑Not Applicable <br />❑Complies <br />❑Does Not <br />❑Not Observable <br />❑Not Applicable <br />R- ❑Complies <br />❑Does Not <br />❑Not Observable <br />❑Not Applicable <br />402.4.2, <br />Building envelope tightness ACH 50 = <br />ACH 50 = ❑Complies <br />402.4.2.1 <br />verified by blower door test result <br />❑Does Not <br />[F117]1 <br />of <7 ACH at 50 Pa. This <br />[:]Not Observable <br />requirement may instead be met <br />❑Not Applicable <br />via visual inspection, in which <br />case verification may need to <br />occur during Insulation <br />Inspection. <br />403.2.2 <br />Post construction duct tightness cfm <br />cfm ❑Complies <br />[F14]1 <br />test result of -8 cfm to outdoors, <br />❑Does Not <br />or :512 cfm across systems. Or, <br />❑Not Observable <br />rough -in test result of <_6 cfm <br />❑Not Applicable <br />across systems or s4 cfm <br />without air handler. Rough -in test <br />verification may need to occur <br />during Framing Inspection. <br />403.1.1 <br />Programmable thermostats <br />❑Complies <br />[F19]2 <br />installed on forced air furnaces. <br />❑Does Not <br />V <br />❑Not Observable <br />❑Not Applicable <br />403.1.2 <br />Heat pump thermostat installed <br />❑Complies <br />[FI10]2 <br />on heat pumps. <br />❑Does Not <br />❑Not Observable <br />❑Not Applicable <br />403.4 <br />Circulating service hot water <br />❑Complies <br />[FI11]2 <br />systems have automatic or <br />❑Does Not <br />accessible manual controls. <br />❑Not Observable <br />❑Not Applicable <br />404.1 <br />50% of lamps in permanent <br />❑Complies <br />[F16]1 <br />fixtures are high efficacy lamps. <br />❑Does Not <br />d <br />❑Not Observable <br />❑Not Applicable <br />401.3 <br />Compliance certificate posted. <br />❑Complies <br />[F17]2 <br />❑Does Not <br />IV <br />❑Not Observable <br />❑Not Applicable <br />303.3 <br />Manufacturer manuals for <br />❑Complies <br />[F118]3 <br />mechanical and water heating <br />❑Does Not <br />d, <br />equipment have been provided. <br />❑Not Observable <br />❑Not Applicable <br />Additional Comments/Assumptions: <br />1 High Impact (Tier 1) 2 !Medium Impact (Tier 2) 13 Low Impact (Tier 3) <br />Project Title: Proposed Addition Report date: 01/26/21 <br />Data filename: C:\Users\veaeschleman\Documents\REScheck\4715 West View Dr_Calculations.rck Page 7 of 8 <br />