Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through this Project's Public Works <br />Reviewer Thad Newport with City of Everett Permit Services (TNewpon(meverettwa.vov). <br />g <br />Document <br />Sht/Pg <br />Revell Comment <br />Designees Response <br />Initials <br />1 <br />Plans <br />— <br />This project is within the combined stormwater/sewer basin. <br />Projects with 200SF or more of new impervious surface in the <br />combined stormwater/sewer area are required to meet the Flow <br />Control Performance Standard outlined in the City of Everett <br />Design and Construction Standards and Specifications Chapter <br />6-10. 1 have included the section as an attachment to the <br />correction email. Please provide a drainage report and revised <br />plans outlining how this project will meet the Flow Control <br />Performance Standard for the new impervious surface area. <br />Paget of 2 <br />