Laserfiche WebLink
INSTALL END GROUP OE <br />FASTENERS WITHIN E"OF <br />EACH END. (3) SCREWS MIN <br />TOP OF CEILING JOIST OR <br />TOP OF WALL <br />OPTION 1 - FULL LENGTH SISTER <br />SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE. <br />IN) INSTALL SIMP;ON A34 Cl IP, <br />V) SISTER MEMBER TO BE FULL <br />LENGTH, ATTACH TO (E) RAFTER W1 <br />-kx3- WOOD SCREWS STAGGERED <br />TOP AND BOTTOM® I Ir O.C. <br />BLUE RAVEN <br />1403 N. Research Way <br />Orem, LIT 84097 <br />800.377.4480 <br />W W W. BLU ERAVENSOLAR.COM <br />CONFIDENTIAL -THE INFORMATION <br />HEREIN CONTAINED SHALL NOT BE <br />USED FOR THE BENEFIT OF ANYONE <br />EXCEPT BLUE RAVEN SOLAR NOR <br />SHALL IT BE DISCLOSED IN WHOLE OR <br />IN PART TO OTHERS OUTSIDE <br />RECIPIENTS ORGANIZATION, EXCEPT <br />IN CONNECTION WITH THE SALE AND <br />USE OF THE RESPECTIVE EQUIPMENT, <br />WITHOUT THE WRITTEN PERMISSION <br />OF BLUE RAVEN SOLAR LLC. <br />NABCEP <br />CERTIFIED <br />PV INSTALLATION <br />PROFESSIONAL <br />Scott Gurney <br />#PV-011719-015866 <br />CONTRACTOR: <br />BRS FIELD OPS <br />800-377-4480 <br />IN) INSTALL SIMPSON A34 CLIP. <br />Q <br />Z <br />O <br />(E) RAFTERS (N) SISTER MEMBER TO BE FULL <br />LENGTH, ATTACH TO (E) RAFTER Wr <br />N <br />H 00 <br />J<` <br />INSTALL END GROUP OF x3' WOOD SCREWS STAGGERED <br />Q <br />00 <br />00 <br />FASTENERS WITHIN 6' OF TOP AND BOTTOM C 1E' O.C. <br />O <br />In <br />EACH END, (3) SCREWS MIN <br />O � <br />LJ.I LJ.I <br />Sealed For <br />LL N <br />Z co Q co <br />N N <br />Cn Cn <br />Existing Roof & <br />> �. <br />w :� .E <br />w w <br />(I-) CEILING JOIST <br />Attachment Only <br />u) E <br />O <br />(3)W U) <br />F- <br />>- >- <br />SISTER T: Sr WITHIN 3' Or <br />F. � <br />TOP OF CEILING JOIST OR <br />U 00 W <br />TOP OF WALL <br />"-' 00 > <br />L) () <br />OPTION 2- OVERLAPPED SISTER <br />0 2 1 W <br />a o <br />SEE LETTER FOR UPGRADE LAP LENGTH AND SIZL, <br />ALAILA <br />Upsized sister upgrade is required <br />for (MP1) on all rafters that <br />directly support solar PV where <br />the horizontal span exceeds 6'-6". <br />Stitch new 2x6 DF#2 (min) to <br />existing member. See detail for <br />additional information. <br />(N) SISTER RAFTER <br />L�z <br />(N) SISTER RAFTER (E) RAFTER <br />SECTION A -A <br />SISTER UPGRADE OPTIONS <br />ALTERNATIVE FASTENER SCHEDULE; 10d NAILS STAGGERED TOP AND BOTTOM AT 6" O.C. <br />Imo' W C N 'e <br />O ov As',t,,�, F <br />DRAWING BY: <br />Brendan Fillmore <br />7 -I— PLOT DATE: <br />July 17, 2023 <br />PROJECT NUMBER: 46056 812082 <br />:NAL�'` SHEET NAME: <br />STRUCTURAL <br />REVISION: PAGE NUMBER: <br />7/17/23 0 PV4.1 <br />