My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 SUMMIT AVE 2023-11-30
>
Address Records
>
SUMMIT AVE
>
1818
>
1818 SUMMIT AVE 2023-11-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 9:34:58 AM
Creation date
11/2/2023 8:07:48 AM
Metadata
Fields
Template:
Address Document
Street Name
SUMMIT AVE
Street Number
1818
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-M-SOLAR BONDING CONNECTION GROUND PATHS; Z <br />me ------ MOUNT---------------------------------------------------------------- INSTALLATION GUIDE-'I- P A G-E <br />TEMPORARY <br />BONDIN ♦ A <br />CONN> CTION t „' - <br />BONDING MID - <br />CLAMPS MAINTAIN <br />GROUND PATH <br />I� <br />TEMPORARY BONDING CJONNECTION DURING ARRAY MAINTENANCE <br />When removing modules for replacement or system maintenance, any module left in place that is secured <br />with a bonding Midclamp will be properly grounded. If a module adjacent to the end module of a row is <br />removed or if any other maintenance condition leaves a module without a bonding mid clamp, a temporary <br />bonding connection must be installed as shown <br />• Attach Ilsco SCB4 to wall of rail <br />• Attach Ilsco SGB4 to module frame <br />• Install solid copper wire jumper to Ilsco lugs <br />ELECTRICAL WNSIDERATIONS <br />SOLARMOUNT is intended to be used with PV <br />modules that have a system voltage less than or <br />equal to that allowable by the NEC. For standard <br />system grounding a minimum 10AWG,105 °C copper <br />grounding conductor should be used to ground a <br />1000 VDC system, according to the National Electric <br />Code (NEC). It is the installer's responsibility to <br />check local codes, which may vary. See below for <br />interconnection information. <br />INTERCONNECTION INFORMATION <br />There is no size limit on how many SOLARMOUNT <br />& PV modules can be mechanically interconnected <br />for any given configuration, provided that the <br />installation meets the requirements of applicable <br />building and fire codes. <br />GROUNDING NOTES <br />The installation must be conducted in accordance <br />with the National Electric Code (NEC) and the <br />authority having jurisdiction. Please refer to these <br />resources in your location for required grounding lug <br />quantities specific to your project. <br />The grounding / bonding components may overhang <br />parts of the array so care must be made when <br />walking around the array to avoid damage. <br />Conductor fastener torque values depend on <br />conductor size. See product data sheets for correct <br />torque values. <br />BLUE RAVEN <br />1403 N. Research Way <br />Orem, UT 84097 <br />800.377.4480 <br />W W W. BLU ERAVENSOLAR.COM <br />CONFIDENTIAL -THE INFORMATION <br />HEREIN CONTAINED SHALL NOT BE <br />USED FOR THE BENEFIT OF ANYONE <br />EXCEPT BLUE RAVEN SOLAR NOR <br />SHALL IT BE DISCLOSED IN WHOLE OR <br />IN PART TO OTHERS OUTSIDE <br />RECIPIENTS ORGANIZATION, EXCEPT <br />IN CONNECTION WITH THE SALE AND <br />USE OF THE RESPECTIVE EQUIPMENT, <br />WITHOUT THE WRITTEN PERMISSION <br />OF BLUE RAVEN SOLAR LLC. <br />NABCEP <br />CERTIFIED <br />PV INSTALLATION <br />PROFESSIONAL <br />Scott Gurney <br />#PV-011719-015866 <br />CONTRACTOR: <br />BRS FIELD OPS <br />385-498-6700 <br />DRAWING BY: <br />PLOT DATE: <br />PROJECT NUMBER: <br />SPEC SHEET <br />REVISION: I PAGE NUMBER: <br />SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.