My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3605 EARL AVE 2023-11-28
>
Address Records
>
EARL AVE
>
3605
>
3605 EARL AVE 2023-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2023 11:18:05 AM
Creation date
11/2/2023 8:14:10 AM
Metadata
Fields
Template:
Address Document
Street Name
EARL AVE
Street Number
3605
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report No. 104679753LAX-001 Page 31 of 39 Issued: 29-Sep-2021 <br /> Shanghai CHIKO Solar Technology Co., Ltd Revised: 26-Jun-2023 <br /> 8.0 Test Summary <br /> Evaluation Period March-01-2022 to September-29-2022 Project No.I 6104981282 <br /> Sample Rec. Date March-01-2022 I Condition I Production I Sample ID. LAN2203071432 <br /> Test Location Intertek, 25791 Commercentre Drive, Lake Forest, CA 92630 <br /> Test Procedure Testing Lab <br /> Determination of the result includes consideration of measurement uncertainty from the test equipment and <br /> methods. The product was tested as indicated below with results in conformance to the relevant test criteria. <br /> The following tests were performed: <br /> Test Description Mounting Systems, Mounting Devices, <br /> Bonding Path Resistance Test 13 <br /> Humidity Test 18 <br /> Bonding Conductor Test 22 <br /> Evaluation Period March-01-2022 to September-29-2022 Project No.I 6104981282 <br /> Sample Rec. Date March-01-2022T Condition I Production I Sample ID. LAN2203071432 <br /> Test Location Schneider Electric, 3700 6th street SW, Cedar Rapids, Iowa 52404 <br /> Test Procedure Testing at Manufacturers Premises (TMP) - Level 1 <br /> Determination of the result includes consideration of measurement uncertainty from the test equipment and <br /> methods. The product was tested as indicated below with results in conformance to the relevant test criteria. <br /> The following tests were performed: <br /> Test Description Imounting Systems, Mounting Devices, <br /> Bonding Conductor Test 1 22 <br /> Evaluation Period February-16-2023 to February-21-2023 I Project No.I G105345828 <br /> Sample Rec. Date 2/16/2023 Condition I Production I Sample ID. LAN2302161547 <br /> Test Location Schneider Electric, 3700 6th street SW, Cedar Rapids, Iowa 52404 <br /> Test Procedure Testing Lab <br /> Determination of the result includes consideration of measurement uncertainty from the test equipment and <br /> methods. The product was tested as indicated below with results in conformance to the relevant test criteria. <br /> The following tests were performed: <br /> Test Description IMounting Systems, Mounting Devices, <br /> Metallic Coating Thickness Test 20 <br /> Evaluation Period April-24-2023 to June-26-2023 Project No.I G105372294 <br /> Sample Rec. Date 4/24/2023 Condition Production I Sample ID. LAN2306211423 <br /> Test Location 25791 Commercentre Drive Lake Forest, CA 92630 <br /> Test Procedure Testing Lab <br /> Determination of the result includes consideration of measurement uncertainty from the test equipment and <br /> methods. The product was tested as indicated below with results in conformance to the relevant test criteria. <br /> The following tests were performed: <br /> Mounting Systems, Mounting Devices, <br /> Test Description Clamping/Retention Devices, and Ground Lugs for <br /> Use with Flat-Plate Photovoltaic Modules and Panels <br /> [UL 2703:2015 Ed.1] <br /> Bonding Path Resistance Test 13 <br /> Humidity Test 18 <br /> Mechanical Loading Test 21 <br /> Short Time Current Test 22 <br /> ED 16.3.15(1-Jul-2022)Mandatory <br />
The URL can be used to link to this page
Your browser does not support the video tag.