My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1917 COLBY AVE 2023-11-28
>
Address Records
>
COLBY AVE
>
1917
>
1917 COLBY AVE 2023-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2023 11:23:17 AM
Creation date
11/2/2023 8:21:12 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1917
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Composition Specifications for Roofing Agreement <br /> Estimate prepared for Chet Motekaitis: Estimate for removal and disposal of existing roof and <br /> 1917 Colby Ave installation of complete Valentine roofing system. <br /> Everett,WA 98201, <br /> Estimate includes new roof on house. Attached flat roof not included. Detached Garage not included. <br /> Includes install of flex hose in attic for bathroom ventilation. <br /> Warranty is transferable to the next homeow er,a one time transfer. <br /> Eave Vent:COR-A-VENT Invent will be instal6dun ofing for attic intake ventilation.Customer agrees to accept the appearance of <br /> the continuos vent;customer initials here: ((((((//////• • <br /> Estimate includes flat roof above upstairs bathroom. <br /> Underlayment: Install Titanium X30 Premium Snythetic Roofing Underlayment over entire roof deck. <br /> Ice and Water Shield:Apply ice and water shield around all roof penetrations. <br /> Fasteners:Galvanized nails will be used to install composition roofing. Customer understands that nails may penetrate through <br /> underside of roof deck and this bid does not include clipping nails or painting soffits. <br /> Starter Course:Specially designed starter course will be installed to all gutter and rake edges. <br /> Flashings:All flashings used will be 26 gauge galvanized,enamel coated flashings.The color of the flashing will be black or brown and <br /> will be chosen by Valentine Roofing to best match roof color. <br /> Drip Edge Flashing: Install 2"drip edge metal at all gable(rake)edges.White drip edge is available upon request. <br /> Gutter Edge Flashing: Install 1x3 gutter edge metal at all gutter edges. <br /> Step Flashing: Install new step flashing tins behind siding. <br /> Roof to Wall Flashing: Install new 3x5 roof to wall flashing behind siding. <br /> Brick Chimney Flashings:Install new 26 gauge flashings and Ice and Water Shield around all sides of chimney.Existing counter <br /> flashings built into chimney structure will be preserved,secured,and painted to match roof color. <br /> Skylight/Chimney Flashing:Install new metal flashings on all sides of skylight and/or where the chimney meets the roof. <br /> When brick chimney is removed,Valentine will make a good faith effort to minimize debris falling down chimney.Customer will <br /> coordinate Valentine schedule with HVAC to install chimney pipe to keep chimney functional. <br /> Ridge Vent: Install COR-A-VENT ridge vent system to ventilate attic. <br /> Plumbing Vents:Replace all existing pipe flashings with new heavy lead pipe flashings and heavy lead caps. <br /> Fan Vents:Replace all existing exhaust vents with new enamel coated,26 gauge metal vents. <br /> Gable Vents:Close off gable vents from inside attic. <br /> Ridge Cap:Specially manufactured ridge cap units will be installed on all ridges. <br /> Paint:All furnace vent pipes and all plumbing and electrical pipe flashings will be painted with a rust proof paint. <br /> Roof Anchors: Install roof anchors as needed during project.Anchors will remain after project completion. <br /> Grommets:Anywhere that flashing must be nailed and left exposed,fasteners with grommets will be used to seal nail hole. <br /> Clean up:Grounds will be thoroughly cleaned daily and at project completion. <br /> Valentine Roofing, Inc. <br /> -may Mof2&Ar Hark Ueh <br /> 09-30-2023 <br /> Print Name Date Representative September 30,2023 <br /> Document Ref:77NY3-FEWOZ-BDFNI-VD6PZ Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.