My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/11/01 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/11/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2023 9:12:09 AM
Creation date
11/2/2023 8:21:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: PSA for Cabinet Charging Infrastructure at Public Works with BCE Engineers, Inc. <br />Council Bill # interoffice use <br /> <br />Project: Cabinet Charging Infrastructure at Public Works <br />Partner/Supplier: BCE Engineers, Inc. <br /> Location: 3200 Cedar Street <br />Preceding action: RFQ 2023-118 <br />Fund: 425/Transit <br />Agenda dates requested: <br />11/01/23 <br /> <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />PSA <br /> <br />Department(s) involved: <br />Transit <br /> <br />Contact person: <br />Tom Hingson <br /> <br />Phone number: <br />425-257-8939 <br /> <br />Email: <br />thingson@everettwa.gov <br />Initialed by: <br />TEH <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />Summary of PSA with Elcon Associates, Inc. <br />• Project Cost $35,600.00 <br />• Total Compensation (Not to Exceed) $35,600.00 <br />Project summary statement: <br />Everett Transit is planning to purchase an additional fourteen (14) 100% electric buses <br />and will expand the bus charging system(s) at the Public Works yard at 3200 Cedar <br />Street, Everett. BCE Engineers, Inc. is tasked with providing all necessary engineering, <br />design, components list, bid documents and anything else necessary to enable Everett <br />Transit to release a construction bid for competitive procurement. In addition, the <br />consultant is being tasked to perform the functions of construction management <br />throughout the construction phase to ensure that the construction contractor meets all <br />specifications and provides Everett Transit with a “turnkey” charging system. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign the PSA for Cabinet Charging Infrastructure at Public Works with BCE <br />Engineers, Inc., in the amount of $35,600.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.