Laserfiche WebLink
*14%r <br /> ■■ SUNBLUE RA <br /> FLASHINGSLIDERS . G <br /> MM FRAME 1403 N RESEARCH WAY,BUILDING J <br /> SFM■■ REM,UT MICRORAILTM INSTALLATION GUIDE 'I PAGE O 00-377-44807 <br /> W W W.BLUERAVENSOLAR.COM <br /> CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> INSTALL SLIDERS AND USED FOR THE BENEFIT OF <br /> ANYONE EXCEPT BLUE RAVEN <br /> ROOF ATTACHMENTS: SOLAR NOR SHALL IT BE <br /> UP-SLOPE DISCLOSED IN WHOLE OR IN PART <br /> Follow manufacturer instructions TO OTHERS OUTSIDE RECIPIENTS <br /> ORGANIZATION,EXCEPT IN <br /> forflashing installation procedures CONNECTION WITH THE SALE AND <br /> USE OF THE RESPECTIVE <br /> ......am.�. EQUIPMENT,WITHOUT THE <br /> WRITTEN PERMISSION OF BLUE <br /> RAVEN SOLAR LLC. <br /> s <br /> NABCEP <br /> CERTIFIED <br /> PV INSTALLATION <br /> PILOT HOLES: FLASHINGS: PROFESSIONAL <br /> SGOfturney <br /> Drill pilot holes for lag screws or Place flashings Mod NS+ 1" #PV-01 1719-015866 <br /> structural screws (as necessary) at CONTRACTOR: <br /> marked attachement points BRS FIELD OPS <br /> 385.498.6700 <br /> Y • • <br /> NOTE: If N-S module edge is within 1"of the • <br /> shingle course above,you have the option to <br /> pivot/rotate slider at the attachment point <br /> to span the next course and cut shingles as <br /> required. <br /> Cut Shingles as Required <br /> _ p r---n--i <br /> Mod NS + 1• <br /> Rotate Slider <br /> _ ___ <br /> INSTALL SLIDERS AND TRIMRAIL ROOF ATTACHMENTS: N/S MODULE EDGE ' <br /> Insert flashings per manufacturer instructions -- -L.essTha ------ <br /> • <br /> NOTE: Use Lag screw (- .1tructurai Fastener with a maximum diameter of 5/16" <br /> • Attach sliders to rafters <br /> • Verify proper row to row spacing for module size (Mod NS+ 1') <br /> • Ensure that Tri mrailTM roof attachments in each row have sufficient I II !I II <br /> engagement with slider dovetails for proper attachment. I i I DOWN-SLOPE <br /> SHEET NAME <br /> SPEC SHEET <br /> PAGE NUMBER REVISION <br /> SS 0 <br />