Laserfiche WebLink
(1) 10 AWGTHHN/THWN-2,CU.,BLACK(Ll) 13.1 A AC (1) 10 AWGTHHN/THWN-2,CU.,BLACK(Ll) MAX 13.1 AA (1) 10 AWGTHHN/THWN-2,CU.,BLACK(Ll) MAX 13.1 AA (1) 12-2TC-ER,THHN/THWN-2,CU. MAX 13.1 AAC <br /> 15 (1) 10 AWG THHN/THWN-2,CU.,RED(1-2) 240 V AC 3 (1) 10 AWGTHHN/THWN-2,CU.,RED(L 2) 240 V A (1) 10 AWGTHHN/THWN-2,CU.,RED(L2) 240 V A 1 (1) 6 AWG BARE,CU(EGC) 240 V AC <br /> (1) 10 AWG THHN/THWN-2,CU.,WHITE(N) (1) 10 AWGTHHN/THWN-2,CU.,GREEN(EGC) (1) 10 AWGTHHN/THWN-2,CU.,GREEN(EGC) <br /> (1) 10 AWGTHHN/THWN-2,CU.,GREEN(EGC) OR 10-2 OF-B W/G,THHN/THWN-2,SOLID CU. OR 10-2 OF-B W/G(OR NM-B),THHN/THWN-2,SOLID CU. <br /> (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT(Not Required for OF-B or NM-B Cable) INTERIOR EXTERIOR BLUE RAVEN <br /> 1403 N. Research Way <br /> DESIGNER NOTES: ELECTRICAL NOTES: Orem, UT 84097 <br /> 800.377.4480 <br /> LOAD SIDE BREAKER IN MSP ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. WWW.BLUERAVENSOLAR.COM <br /> CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> IN PART TO OTHERS OUTSIDE <br /> RECIPIENTS ORGANIZATION,EXCEPT <br /> ENPHASE IQ COMBINER 4 IN CONNECTION WITH THE SALE AND <br /> (E)200A MAIN SERVICE PANEL X-IQ-AM1-240-4 USE OF THE RESPECTIVE EQUIPMENT, <br /> (E)200A/2P MAIN BREAKER (SOLAR LOAD ONLY) WITHOUT THE WRITTEN PERMISSION <br /> OF BLUE RAVEN SOLAR LLC. <br /> PV AC DISCONNECT <br /> (E)200A/2P NON-FUSED <br /> L, LOCKABLE,VISIBLE OPEN (10) REC Solar REC420AA PURE-R <br /> L2 30A,240V,2-POLE UL 1703 COMPLIANT NABCEP <br /> N <br /> (E)LOADS ENVOY (10) Enphase IQ7X-96-2-US CERTIFIED <br /> *PV BREAKER TO BE LOCATED 1 PHASE,UL 1741 COMPLIANT <br /> AT OPPOSITE END OF BUSSING15A/2P <br /> FROM MAIN BREAKER 4"x4"x4"PVC JB-1 EZ SOLAR <br /> N JUNCTION BOX JUNCTION BOX PV INSTALLATION <br /> (N)20A/2P L (N)20A/2P L JB -]LI JB-1 L, (1) CIRCUIT OF PROFESSIONAL <br /> L1 <br /> L2 L2 L2 L2r <br /> L2 Scott Gurney <br /> EGC EGC _______________________ _ r___ EGC _EGC __EGC �_ ti 10 MODULES #PV-011719-015866 <br /> ----------------------------------———— CONTRACTOR: <br /> 120/6204HZAC N J3 1 BRS FIELD OPS <br /> 1 PHASE I *JUNCTION BOX <br /> TO UTILITY <br /> l OPTIONAL IF OF-B 800-377-4480 <br /> GRID l CABLE USED FOR <br /> G J ENTIRE HOMERUN <br /> rJ <br /> l _ <br /> (E)GROUNDING ` " O M <br /> Y <br /> ELECTRODE(S) q O Lo Y <br /> Q 00 N <br /> t� It• -CV177 113 ' Q p W W <br /> r < -� a IL r-4 <br /> N <br /> ` o Z c N <br /> Cn C)dltW W 8 <br /> WASIr>,�t{.L 4Y U .ai�.:�1LU LU Uj <br /> (6 H H <br /> cl) <br /> _ - <br /> TA3N N <br /> f1 _ i� � <br /> v <br /> 54072 �- v � tiw' ao <br /> w� — <br /> .tt{ GISTER sni.c�i +�01 (�1 <br /> sStONALE�G -xc a�ar� PA'1 0-'k!c• r DRAWING BY: <br /> Brendan Fillmore <br /> 2 023 , 10, 1 - PLOT DATE <br /> October 11, 2023 <br /> INTERCONNECTION NOTES <br /> PROJECT NUMBER: <br /> 705.12(8)(3)THE FOLLOWING METHOD(S)SHALL BE USED TO 1 13 :39:28 873582 <br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, <br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER . SHEET NAME: <br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT O O O <br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE _ ELECTRICAL <br /> POWER-SOURCE(S)OUTPUT CIRCUIT CURRENT AND THE RATING OF �` <br /> THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT ' REVISION: PAGE NUMBER: <br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Snohomish County Public Utilities District (PUD) PERMIT ISSUER: City of Everett 0 PV5 <br />