Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (19)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (40OW) <br /> (19)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:7.600 kWDC <br /> ■■ ; SOLAR SYSTEM GROUNDING ■ �;; SOLAR APPENDIX C :: N AC SYSTEM SIZE:5.700kWAC <br /> NSTANDARD <br /> om■ ; MOUNT INSTALLATION GUIDE--:-PAGE 1■ MOUNT F� ; PAGE <br /> ---------------------------------------------------------------------------------------------------------------------------------- -------- -----------------------------------------------------------------------UNIVERSA�------------,A------MIDCLAMP----------------INSTALLATION------------------GUIDE------------------ <br /> WEEBLUG TERMINALTORQUE, <br /> Single Use Only REVISIONS <br /> Install conductor and DESCRIPTION DATE REV <br /> torque to the foRowin. <br /> s-14 AWG:se-I REVISION 12/0612022 A <br /> Al REVISION 01/11/2023 B <br /> d <br /> =fie <br /> PROJECT NAME&ADDRESS <br /> ONLY ONE LUG PER ROW OF MODUL '-� - <br /> __ WEEBLUG CONDUCTOR-UNIRAC P/N 0080025: <br /> Only one lug per row of modules is Q-� <br /> required. See Page F for additional tugs _�� Apply Anti Seize and insert a bolt in the aluminum rail and through the clearance hole " W <br /> required for expansion joints. in the stainless steel flat washer. Place the stainless steel flat washer on the bolt, D <br /> 1.Position clam to align T-bott with rail 2.Rotate clam clockwise 2/3 of a turn 3.Slide clam Into position against 4.Place second module. <br /> -,- � oriented so the dimples will contact the aluminum rail Place the lug portion on the P 9 P P� P 9 � <br /> bolt and stainless steel flat washer.Install stainless steel flat washer,lock washer and slot.Lower clamp and insert T-bolt into to engage T-bolt inside rail slot. module. <br /> nut.Tighten the nut until the dimples are completely embedded into the rail and lug. rail slot <br /> TORQUE VALUE 10 ft lbs.(See Note on PG.A) 00 <br /> - - - See product data sheet for more details,Model No.WEEB-LUG-6.7 <br /> >Q O <br /> GROUNDING LUG MOUNTING DETAILS: > O <br /> Star Washer is L0 <br /> Details are provided for both the WEEB and Ilsco products.The WEEBLug has a single Use Only CVO <br /> grounding symbol located on the lug assembly.The Ilsco lug has a green colored WC:) <br /> screw for grounding indication purposes.Installation must be in accordance �-_ ~ W0') <br /> p0 <br /> with NFPA NEC 70,however the electrical designer of record should refer to the z z of CV <br /> Latest revision of NEC for actual grounding conductor cable size. O TERMINALTORQUE, Q W It <br /> Required if not using approved integrated grounding microinveters InstallConductor and D_ 0 > F- <br /> torque to the following: Q —\� W O <br /> a y� A in-Lbs <br /> AWG: lbs <br /> \PIf/l 8 AWG:25 in-lbs CoLU LUL0 <br /> 10-14 AWG:20 in-lbs (Z' Q <br /> GROUND LUG BOLT SIZEDRILLSIZE ILSCO LAY-IN LUG CONDUCTOR-UNIRACP/N 008009P:Alternate Grounding Lug <br /> Y <br /> WEEBLug 1/4' N/A-place in Top SM Rail Slot -Drill,deburr hole and bolt thru both rail watts per table. 5.Tighten bolt and torque to 15 ft-lbs. NOTE:If excessive force is applied in <br /> IISCO Lug u10-32 7/32- TORQUE VALUE 5 ft lbs.(See Note on PG.A) step 2,the cap may over-rotate causing Q Q <br /> See ILSCO product data sheet for more details,Model No.GBL-4DBT. it to be mis-aligned with the module m <br /> Torque value depends on conductor size. frame.If this occurs,keep rotating the <br /> See product data sheet for torque value. cap clockwise until it returns to the O <br /> NOTE:ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION original position. <br /> J <br /> r <br /> DATE: 1/11/2023 <br /> F SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-20 <br />