(1) 10 AWGTHHN/-rHWN-2,CU.,BLACK(Ll) 157 AAC (1) 10 AWGTHHN/THWN-2,CU-,BLACK(1-1) MAX 15.7 A A( (1) 10 AWGTHHN/THWN-2,CU-,BLACK(Ll) MAX 15.7 A Al (1) 12-2 TC.ER,THHN/THWN-2,CU. MAX 15.7 A AC
<br /> 15 (1) 10 AWG THHN/THWN-2,CU.,RED(L2) 240 V AC 3 (1) 10 AWGTHHN/THWN-2,CU,RED(L2) 240 V A 2 (1) 10 AWGTHHN/THWN-2,CU.,RED(L2) 240 V 1 (1) 6 AWG RARE,CU(EGC) 240 V AC
<br /> (1) 10 AWG THHN/THWN-2,CU.,WHITE(N) (1) 10 AWG THHN/THWN-2,CU_,GREEN(EGC) (1) 10 AWG THHN/THWN-2,CU.,GREEN(EGC)
<br /> (1) 10 AWG THHN/THWN-2,CU.,GREEN(EGC) OR 10-2 UF-8 W/G,THHN/THWN-2,SOLID CU. OR 10-2 UF-8 W/G(OR NM-B),THHN/THWN-2,SOLID CU.
<br /> (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT(Not Required for OF-8 or NM-B Cable) EXTERIOR EXTERIOR BLUE RAVEN
<br /> 1403 N. Research Way
<br /> Orem, UT 84097
<br /> 800.377.4480
<br /> W W W.BLUERAVENSOLAR.COM
<br /> DESIGNER NOTES: ELECTRICAL NOTES: CONFIDENTIAL-THE INFORMATION
<br /> HEREIN CONTAINED SHALL NOT BE
<br /> LOAD SIDE BREAKER IN MSP.INTERIOR POI.PLEASE THIN 4 20 A BREAKERS TO MAKE ROOM FOR PV BREAKER. ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE
<br /> EXCEPT BLUE RAVEN SOLAR NOR
<br /> SHALL IT BE DISCLOSED IN WHOLE OR
<br /> IN PART TO OTHERS OUTSIDE
<br /> RECIPIENTS ORGANIZATION,EXCEPT
<br /> ENPHASE IQ COMBINER 4 IN CONNECTION WITH THE SALE AND
<br /> (E)200A MAIN SERVICE PANEL X-IQ-AM1-240-4 USE OF THE RESPECTIVE EQUIPMENT,
<br /> (E)200A/2P MAIN BREAKER (SOLAR LOAD ONLY)
<br /> WITHOUT THE WRITTEN PERMISSION
<br /> OF BLUE RAVEN SOLAR LLC.
<br /> PV AC DISCONNECT
<br /> (E)200A/2P NON-FUSED
<br /> L, LOCKABLE,VISIBLE OPEN (12) REC Solar REC420AA PURE-R
<br /> L2 30A,240V,2-POLE UL 1703 COMPLIANT NABCEP
<br /> N
<br /> (E)LOADS ENVOY (12) Enphase IQ7X-96-2-US CERTIFIED
<br /> *PV BREAKER TO BE LOCATED 1 PHASE,UL 1741 COMPLIANT
<br /> AT OPPOSITE END OF BUSSING g2p
<br /> FROM MAIN BREAKER 4"x4"x4"PVC JB-1 EZ SOLAR
<br /> N JUNCTION BOX JUNCTION BOX PV INSTALLATION
<br /> (N)20A/2P
<br /> L, Ll (N)20A/2P Ll JB _]L, JB-1 L, (1) CIRCUIT OF PROFESSIONAL
<br /> L2 L2
<br /> N N L2 L2 Scott Gurney
<br /> Eco Eco r-__ Eco -Eco �___EG� _ _ 12 MODULES #PV-011719-015866
<br /> ---------------------------------------
<br /> FFG
<br /> 120/240 VAC N I CONTRACTOR:J 3 2 1
<br /> 60HZ I 15 15
<br /> 1 PHASE BOX BRS FIELD OPS
<br /> I JUNCTION
<br /> TO UTILITY I OPTIONAL IF OF-B 800-377-4480
<br /> CABLE USED FOR
<br /> GRID
<br /> G J I ENTIRE HOMERUN
<br /> U U
<br /> I -- Q
<br /> I
<br /> Z
<br /> (E)GROUNDING O C7
<br /> 00 _�e �
<br /> 1
<br /> ELECTRODE(S) . -e ' �
<br /> w I O
<br /> > O M L0
<br /> � 2 i_ � • Q < Q 0) W W
<br /> � WAS�w w e'�t 'dIs .T �, ' Z Q Z N N
<br /> �� 4 ox • • 00 co
<br /> WDQH HH
<br /> DUNCA O } mow > �
<br /> -N 3:CO J (.0 w co
<br /> FS G`
<br /> S�ONA w Q
<br /> ~ U > N �
<br /> L� � CL ZOO ►rS;; ,; ryly 25
<br /> 2 ov 11 814C A
<br /> 2 S 4 TA Q 3w ----`f��rltiow�I K„12 DRAWING BY:
<br /> 2023 .09. 11 s D I211254
<br /> Brendan Fillmore
<br /> PLOT DATE:
<br /> •
<br /> 0, -
<br /> '2
<br /> September 8, 2023
<br /> ,3,- -7
<br /> INTERCONNECTION NOTES
<br /> PROJECT NUMBER:
<br /> 705.12(8)(3)THE FOLLOWING METHOD(S) SHALL BE USED TO
<br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, —06'00' 845881
<br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER SHEET NAME:
<br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT
<br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE ELECTRICAL
<br /> POWER-SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF
<br /> THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT REVISION: PAGE NUMBER:
<br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Snohomish County Public Utilities District (PUD) PERMIT ISSUER: City of Everett 0 PV5
<br />
|