Laserfiche WebLink
(1) 10 AWGTHHN/-rHWN-2,CU.,BLACK(Ll) 157 AAC (1) 10 AWGTHHN/THWN-2,CU-,BLACK(1-1) MAX 15.7 A A( (1) 10 AWGTHHN/THWN-2,CU-,BLACK(Ll) MAX 15.7 A Al (1) 12-2 TC.ER,THHN/THWN-2,CU. MAX 15.7 A AC <br /> 15 (1) 10 AWG THHN/THWN-2,CU.,RED(L2) 240 V AC 3 (1) 10 AWGTHHN/THWN-2,CU,RED(L2) 240 V A 2 (1) 10 AWGTHHN/THWN-2,CU.,RED(L2) 240 V 1 (1) 6 AWG RARE,CU(EGC) 240 V AC <br /> (1) 10 AWG THHN/THWN-2,CU.,WHITE(N) (1) 10 AWG THHN/THWN-2,CU_,GREEN(EGC) (1) 10 AWG THHN/THWN-2,CU.,GREEN(EGC) <br /> (1) 10 AWG THHN/THWN-2,CU.,GREEN(EGC) OR 10-2 UF-8 W/G,THHN/THWN-2,SOLID CU. OR 10-2 UF-8 W/G(OR NM-B),THHN/THWN-2,SOLID CU. <br /> (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT(Not Required for OF-8 or NM-B Cable) EXTERIOR EXTERIOR BLUE RAVEN <br /> 1403 N. Research Way <br /> Orem, UT 84097 <br /> 800.377.4480 <br /> W W W.BLUERAVENSOLAR.COM <br /> DESIGNER NOTES: ELECTRICAL NOTES: CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> LOAD SIDE BREAKER IN MSP.INTERIOR POI.PLEASE THIN 4 20 A BREAKERS TO MAKE ROOM FOR PV BREAKER. ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> IN PART TO OTHERS OUTSIDE <br /> RECIPIENTS ORGANIZATION,EXCEPT <br /> ENPHASE IQ COMBINER 4 IN CONNECTION WITH THE SALE AND <br /> (E)200A MAIN SERVICE PANEL X-IQ-AM1-240-4 USE OF THE RESPECTIVE EQUIPMENT, <br /> (E)200A/2P MAIN BREAKER (SOLAR LOAD ONLY) <br /> WITHOUT THE WRITTEN PERMISSION <br /> OF BLUE RAVEN SOLAR LLC. <br /> PV AC DISCONNECT <br /> (E)200A/2P NON-FUSED <br /> L, LOCKABLE,VISIBLE OPEN (12) REC Solar REC420AA PURE-R <br /> L2 30A,240V,2-POLE UL 1703 COMPLIANT NABCEP <br /> N <br /> (E)LOADS ENVOY (12) Enphase IQ7X-96-2-US CERTIFIED <br /> *PV BREAKER TO BE LOCATED 1 PHASE,UL 1741 COMPLIANT <br /> AT OPPOSITE END OF BUSSING g2p <br /> FROM MAIN BREAKER 4"x4"x4"PVC JB-1 EZ SOLAR <br /> N JUNCTION BOX JUNCTION BOX PV INSTALLATION <br /> (N)20A/2P <br /> L, Ll (N)20A/2P Ll JB _]L, JB-1 L, (1) CIRCUIT OF PROFESSIONAL <br /> L2 L2 <br /> N N L2 L2 Scott Gurney <br /> Eco Eco r-__ Eco -Eco �___EG� _ _ 12 MODULES #PV-011719-015866 <br /> --------------------------------------- <br /> FFG <br /> 120/240 VAC N I CONTRACTOR:J 3 2 1 <br /> 60HZ I 15 15 <br /> 1 PHASE BOX BRS FIELD OPS <br /> I JUNCTION <br /> TO UTILITY I OPTIONAL IF OF-B 800-377-4480 <br /> CABLE USED FOR <br /> GRID <br /> G J I ENTIRE HOMERUN <br /> U U <br /> I -- Q <br /> I <br /> Z <br /> (E)GROUNDING O C7 <br /> 00 _�e � <br /> 1 <br /> ELECTRODE(S) . -e ' � <br /> w I O <br /> > O M L0 <br /> � 2 i_ � • Q < Q 0) W W <br /> � WAS�w w e'�t 'dIs .T �, ' Z Q Z N N <br /> �� 4 ox • • 00 co <br /> WDQH HH <br /> DUNCA O } mow > � <br /> -N 3:CO J (.0 w co <br /> FS G` <br /> S�ONA w Q <br /> ~ U > N � <br /> L� � CL ZOO ►rS;; ,; ryly 25 <br /> 2 ov 11 814C A <br /> 2 S 4 TA Q 3w ----`f��rltiow�I K„12 DRAWING BY: <br /> 2023 .09. 11 s D I211254 <br /> Brendan Fillmore <br /> PLOT DATE: <br /> • <br /> 0, - <br /> '2 <br /> September 8, 2023 <br /> ,3,- -7 <br /> INTERCONNECTION NOTES <br /> PROJECT NUMBER: <br /> 705.12(8)(3)THE FOLLOWING METHOD(S) SHALL BE USED TO <br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, —06'00' 845881 <br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER SHEET NAME: <br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT <br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE ELECTRICAL <br /> POWER-SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF <br /> THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT REVISION: PAGE NUMBER: <br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Snohomish County Public Utilities District (PUD) PERMIT ISSUER: City of Everett 0 PV5 <br />