Laserfiche WebLink
SUN i BLUE RAVEN <br /> FLASHKIT MOUNTING 8 SOLAR <br /> ■ S FMFRAME <br /> am MICRORAIL TM INSTALLATION GUIDE ; PAGE <br /> ________________________________________________________________________________________________ <br /> INSTALL SLIDERS AND <br /> ROOF ATTACHMENTS: <br /> Follow manufacturer instructions UP-SLOPE <br /> for flashing installation procedures <br /> 0 <br /> . . <br /> 1 1 <br /> PILOT HOLES: FLASHINGS: <br /> Drill pilot holes for lag screws or Place flashings Mod NS + 1" <br /> structural screws (as necessary) at <br /> marked attachment points <br /> NOTE: If N-S module edge is within 1"of the o <br /> shingle course above,you have the option to <br /> pivot/rotate slider at the attachment point <br /> to span the next course and cut shingles as <br /> required. <br /> Cut Shingles as Required <br /> r---il—n <br /> \ 1 I I <br /> Mod NS + 1.. <br /> Rotate Slider <br /> INSTALL SLIDERS AND TRIMRAIL ROOF ATTACHMENTS: N/s MODULE EDGE II <br /> Insert flashings per manufacturer instructions -- -Less Than 1 ------- <br /> NOTE: Use Lag screw or structural fastener with a maximum diameter of 5/16" H 11 ;' <br /> • Attach sliders to rafters I�= H <br /> 11 ni u n i <br /> • Verify proper row to row spacing for module size (Mod NS + 1") <br /> • Ensure that TrimraiL "roof attachments in each row have sufficient „ Ill NI NI <br /> engagement with slider dovetails for proper attachment. I DOWN-SLOPE <br /> DRAWING NUMBER: <br /> SS <br />