My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electric, LLC 11/6/2023 Change Order 4
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Brink Electric, LLC 11/6/2023 Change Order 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:31 PM
Creation date
11/7/2023 2:29:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electric, LLC
Approval Date
11/6/2023
Council Approval Date
11/1/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive charger power impendance adjustment
Amendment/Change Order
Change Order
Amendment/Change Order Number
4
Tracking Number
0003429
Total Compensation
$306,844.14
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Brink Electrical Inc. 7/19/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 6363 - 4 <br />Inductive Charging Infrastructure for Everett Transit <br /> <br /> <br /> <br /> <br />00 6363 - 4 CHANGE ORDER - AGREED <br /> <br /> <br /> <br /> <br /> <br />Exhibit A—Description of Changed Work <br /> <br />Elcon Engineering and Brink Electric provided short circuit calculation demonstrating the incoming <br />amperage was larger than InductEV inground chargers than allowed. Changed Order No 4 will <br />provide all the work and materials to ensure the incoming amperage will meet the engineered <br />specifications. <br />Enclosed Circuit Breaker <br />Low – Voltage Isolation Transformer <br />E01 – E01 updated line drawing. <br />E02 – E02 updated Electrical Charger Layout <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.