Laserfiche WebLink
(1) 10 AWGTHHN/THWN-2,CU.,BLACK(Ll) 10.5 A AC (1) 10 AWGTHHN/THWN-2,CU.,BLACK(Ll) MAX 10.5 AA (1) 10 AWGTHHN/THWN-2,CU.,BLACK(L1) MAX 10.5 AA (1) 12-2TC-ER,THHN/THWN-2,CU. MAX 10.5 AAC <br /> 1 C (1) 10 AWG THHN/THWN-2,CU.,RED(L2) 240 V AC 3 (1) 10 AWGTHHN/THWN-2,CU.,RED(L 2) 240 V A 2 (1) 10 AWGTHHN/THWN-2,CU.,RED(L2) 240 V A 1 (1) 6 AWG BARE,CU(EGC) 240 V AC <br /> J (1) 10 AWG THHN/THWN-2,CU.,WHITE(N) (1) 10 AWGTHHN/THWN-2,CU.,GREEN(EGC) (1) 10 AWGTHHN/THWN-2,CU.,GREEN(EGC) <br /> (1) 10 AWGTHHN/THWN-2,CU.,GREEN(EGC) OR 10-2UF-B W/G,THHN/THWN-2,SOLID CU. OR 10-2 OF-B W/G(OR NM-B),THHN/THWN-2,SOLID CU. <br /> (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT(Not Required for UF-B or NM-B Cable) INTERIOR EXTERIOR BLUE RAVEN <br /> 1403 N. Research Way <br /> Orem, UT 84097 <br /> 800.377.4480 <br /> W W W.BLUERAVENSOLAR.COM <br /> DESIGNER NOTES: ELECTRICAL NOTES: <br /> CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> LOAD SIDE BREAKER IN MSP.INTERIOR POI ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> IN PART TO OTHERS OUTSIDE <br /> RECIPIENTS ORGANIZATION,EXCEPT <br /> ENPHASE IQ COMBINER 4 IN CONNECTION WITH THE SALE AND <br /> (E)200A MAIN SERVICE PANEL X-IQ-AM1-240-4 USE OF THE RESPECTIVE EQUIPMENT, <br /> (E)200A/2P MAIN BREAKER (SOLAR LOAD ONLY) WITHOUT THE WRITTEN PERMISSION <br /> OF BLUE RAVEN SOLAR LLC. <br /> PV AC DISCONNECT <br /> (E)200A/2P NON-FUSED <br /> L, LOCKABLE,VISIBLE OPEN (8) REC Solar REC420AA PURE-R <br /> L2 30A,240V,2-POLE UL 1703 COMPLIANT NABCEP <br /> N <br /> (E)LOADS ENVOY (8) Enphase IQ7X-96-2-US CERTIFIED <br /> *PV BREAKER TO BE LOCATED 1 PHASE,UL 1741 COMPLIANT <br /> AT OPPOSITE END OF BUSSING15A/2P <br /> FROM MAIN BREAKER 4"x4"x4"PVC JB-1 EZ SOLAR <br /> N JUNCTION BOX JUNCTION BOX PV INSTALLATION <br /> (N)20A/2P L (N)20A/2P L JB -]LI JB-1 L, (1) CIRCUIT OF PROFESSIONAL <br /> L1 <br /> L2N _0 L2 L2 L2 L2 Scott Gurney <br /> EGC EGC ------_ r--- EGC _EGC �___EGC _ ti 8 MODULES #PV-011719-015866 <br /> r--- ---------------------------------------- ----- --- ---------- G --�-- <br /> 120/240 VAC N J 3 2 1 CONTRACTOR: <br /> 60HZ 1s 1s BRS FIELD OPS <br /> 1 PHASE JUNCTION BOX <br /> TO UTILITY OPTIONAL IF OF-B 800-377-4480 <br /> GRID CABLE USED FOR <br /> G J ENTIRE HOMERUN <br /> I U U <br /> I <br /> •• Q <br /> I Z <br /> O <br /> (E)GROUNDING <br /> ., 1H CO � Y <br /> ELECTRODE(S) O7 <br /> L 'j1 ONp . M <br /> C (0 CA N M <br /> wWB LL NN <br /> wase �� .nj Z c to cn <br /> co it W C7 M M W W <br /> 54072 w� '� �� U j >, !` to fn <br /> Lo w' a o <br /> Sto AL�� CL290 240v sw 34DTA 1KR FlM23Sn0hom <br /> ish County put) *it � DRAWING BY: <br /> �ABrendan Fillmore <br /> 1( [; N 538298 <br /> 2023 . 10. 1 <br /> M � <br /> y PLOT DATE: <br /> u OU October 17, 2023 <br /> INTERCONNECTION NOTES <br /> 705.12(8)(3)THE FOLLOWING METHOD(S)SHALL BE USED TO 8 11 :30:27 ' PROJECT NUMBER: <br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, 875774 <br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER —0 0 0' SHEET NAME: <br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT <br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE ELECTRICAL <br /> POWER-SOURCE(S)OUTPUT CIRCUIT CURRENT AND THE RATING OF <br /> THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT REVISION: PAGE NUMBER: <br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Snohomish County Public Utilities District (PUD) PERMIT ISSUER: City of Everett 0 PV5 <br />