My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5527 BROADWAY 2023-11-28
>
Address Records
>
BROADWAY
>
5527
>
5527 BROADWAY 2023-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:23:34 AM
Creation date
11/8/2023 6:16:58 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
5527
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
no <br /> ', <br /> SUN ; BLUE RAVEN <br /> FLASHINGSLIDERS , G <br /> on I FRAME 1 1403 N RESEARCH WAY,BUILDING J <br /> ■■ SFMMICRORAILTM INSTALLATION GUIDI ; PAGE OREM 7-44807 <br /> W W W.BLUERAVENSOLAR.COM <br /> _ CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> INSTALL SLIDERS AND USED FOR THE BENEFIT OF <br /> ANYONE EXCEPT BLUE RAVEN <br /> ROOF ATTACHMENTS: SOLAR NOR SHALL IT BE <br /> UP-SLOPE DISCLOSED IN WHOLE OR IN PART <br /> Follow manufacturer instructions + TO OTHERS OUTSIDE RECIPIENTS <br /> II ORGANIZATION,EXCEPT IN <br /> forflashing installation procedures CONNECTION WITH THE SALE AND <br /> USE OF THE RESPECTIVE <br /> ...._.ate. EQUIPMENT,WITHOUT THE <br /> WRITTEN PERMISSION OF BLUE <br /> RAVEN SOLAR LLC. <br /> � s <br /> NABCEP <br /> CERTIFIED <br /> - PV INSTALLATION <br /> PILOT HOLES: FLASHINGS: PROFESSIONAL <br /> Scott <br /> Drill pilot holes for lag screws or Place flashings Mod NS+ 1" #PV-01 1719-015866 <br /> structural screws (as necessary) at CONTRACTOR: <br /> marked attachement points BRS FIELD OPS <br /> 385.498.6700 <br /> NOTE: If N-S module edge is within 1"of the • <br /> shingle course above,you have the option to <br /> pivot/rotate slider at the attachment point <br /> to span the next course and cut shingles as <br /> " required. <br /> Cut Shingles as Required <br /> r---g--i <br /> Mod NS + 1" <br /> 1 Rotate Slider <br /> INSTALL SLIDERS AND TRIMRAIL ROOF ATTACHMENTS: N/5 MODULE LOGE 1 n <br /> • <br /> I n se rt flas h I ngs per manufacturer instructions <br /> .y0'. y�. �. , . ..,.., .—Almum diameter of 5/16" <br /> • Attach sliders to rafters <br /> • Verify proper row to row spacing for module size (Mod NS + 1") <br /> • Ensure that TrimrailTM roof attachments in each row have sufficient <br /> engagement with slider dovetails for proper attachment. DOWN-SLOPE <br /> ---------- ----- <br /> SHEET NAME <br /> SPEC SHEET <br /> PAGE NUMBER REVISION <br /> SS 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.