ABBREVIATED SPECIFICATIONS
<br />NOTE: NOT ALL SPECIFICATION SECTIONS MAY BE NEEDED FOR THIS PROJECT. CONTRACTOR TO APPLY SPEC, SECTIONS AS APPLICABLE TO SCOPE OF WORK.
<br />GENERAL PLUMBING
<br />NOTE:
<br />CONTRACTOR" MEANS "PLUMBING CONTRACTOR" WHEN REFERENCED
<br />ANYWHERE IN THE PLUMBING CONSTRUCTION DOCUMENTS UNLESS WORKAND
<br />EQUIPMENT HAS BEEN COORDINATED BETWEEN THE PLUMBING AND GENERAL
<br />CONTRACTORS TO BE PROVIDED BY THE GENERAL CONTRACTOR. "NEEDED",
<br />"PROVIDE" AND "INSTALL" MEANS ALL ITEMS CALLED OUT IN THE CONTRACT
<br />DOCUMENTS AND ANY ADDITIONAL ITEMS NOT CALLED OUT BUT REQUIRED TO
<br />MAKE A COMPLETE AND OPERATIONAL SYSTEM.
<br />THE INTENT OF THE SPECIFICATIONS AND THE DRAWINGS IS TO PROVIDE A
<br />COMPLETE AND FULLY OPERATIONAL PLUMBING SYSTEM. THE PLUMBING
<br />CONTRACTOR SHALL FURNISH AND INSTALL ALL LABOR, MATERIAL AND
<br />EQUIPMENT NECESSARY TO COMPLETE THE PLUMBING WORK.
<br />PERMITS AND FEES
<br />THE ITS
<br />CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS,
<br />FEES AND INSPECTIONS NECESSARY TO COMPLETE THE PLUMBING SCOPE OF
<br />WORK.
<br />WARRANTY
<br />THE PLUMBING CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK
<br />TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF
<br />ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY ARCHITECT AND WILL
<br />REPAIR OR REPLACE ANY DEFECTIVE WORK PROMPTLY, WITHOUT CHARGE AND
<br />RESTORE ANY OTHER EXISTING WORK DAMAGED IN THE COURSE OF REPAIRING
<br />DEFECTIVE MATERIALS AND WORKMANSHIP.
<br />PERFORM ALL WORK IN ACCORDANCE WITH THE CURRENT PLUMBING CODE,
<br />STATE AND LOCAL CODES / ORDINANCES AND AHJ. ALL WORK SHALL ALSO BE
<br />IN COMPLIANCE WITH BUILDING OWNER'S CRITERIA. IN CASE OF CONFLICT
<br />BETWEEN THE DRAWINGS, SPECIFICATIONS, CODES, ORDINANCES AND AHJ,
<br />THE MOST STRINGENT STANDARD (IN THE OPINION OF THE ENGINEER) SHALL
<br />APPLY. THE PLUMBING CONTRACTOR SHALL SATISFY CODE, AHJ, DRAWINGS
<br />AND SPECIFICATIONS AS A MINIMUM STANDARD, WITHOUT ANY EXTRA COST.
<br />THE PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING WORK WITH
<br />OTHER TRADES. THE ARCHITECTURAL DRAWINGS SHALL TAKE PRECEDENCE
<br />OVER ALL OTHER DRAWINGS. DO NOT SCALE DISTANCES OFF THE PLUMBING
<br />DRAWINGS; USE ACTUAL BUILDING DIMENSIONS.
<br />SUBMITTALS: CONTRACTOR SHALL PROVIDE AN ELECTRONIC SUBMITTAL FOR
<br />ALL PLUMBING FIXTURES, PUMPS, CONTROLS, INSULATION AND DEVICES. ALL
<br />SUBMITTALS SHALL BE MARKED TO INDICATE WHERE THEY ARE USED AND WITH
<br />THE DESIGNATION IN THESE PLANS.
<br />PIPING
<br />SOIL, WASTE AND VENT PIPING SHALL BE SCHEDULE 40 ASS AND FITTINGS WITH
<br />SOLVENT WELD. HORIZONTAL RUNS SHALL DRAIN AT A GRADE OF 1/4 INCH PER
<br />FOOT WHERE POSSIBLE BUT IN NO CASE LESS THAN 118" PER FOOT. APPLY TO
<br />BUILDING DEPARTMENT FOR VARIANCE IF 1/8" IS NEEDED. COORDINATE WITH
<br />AHJ FOR DRAINAGE REQUIREMENTS FOR EQUIPMENT DESIGNATED WITH
<br />INDIRECT WASTE TO FLOOR DRAINS. PROVIDE PIPED DRAIN TO SANITARY IF
<br />REQUIRED BY AHJ. RELOCATE ANY VENTS NECESSARY TO GIVE 10 FOOT
<br />CLEARANCE FROM HVAC INTAKE. COORDINATE WITH HVAC CONTRACTOR.
<br />DOMESTIC WATER PIPING 2" AND SMALLER SHALL BE COPPER TUBE WITH
<br />WROUGHT COPPER SWEAT FITTINGS JOINED WITH LEAD FREE SOLDER.
<br />PROVIDE TYPE "L" COPPER TUBE ABOVE GROUND AND TYPE "K" BELOW
<br />GROUND. ALTERNATIVELY, UPONOR PEX MAY BE USED WHERE NOT EXPOSED
<br />AND CONCEALED.
<br />CONDENSATE DRANAGE PIPNG: THE PLUMBING CONTRACTOR SHALL F&I
<br />CONDENSATE DRAINS FOR AIR HANDLING UNITS, REFRIGERATION EQUIPMENT
<br />AND ANY OTHER APPLICABLE EQUIPMENT. CONDENSATE DRAINAGE PIPING
<br />SHALL BE SCHEDULE 40 PVC.
<br />BASIC MATERIALS AND METHODS
<br />PROVIDE ALL NEW MATERIAL AND FIXTURES UNLESS NOTED OTHERWISE. ALL
<br />FIXTURES SHALL BE LABELED AND LISTED WHERE REQUIRED BY CODE AND AHJ
<br />PERFORM CUTTING, CORING, FITTING, REPAIRING AND FINISHING OF THE WORK
<br />NECESSARY FOR THE INSTALLATION OF THE FIXTURE. HOWEVER, NO CUTTING
<br />OF THE WORK OF OTHER TRADES OR OF ANY STRUCTURAL MEMBER SHALL BE
<br />DONE WITHOUT THE CONSENT OF THE ARCHITECT, CONSTRUCTION MANAGER,
<br />GC AND / OR OWNER. PROPERLY FILL, SEAL, FIREPROOF AND WATERPROOF
<br />ALL OPENINGS, SLEEVES AND HOLES IN SLABS, WALLS AND CASEWORK.
<br />CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING CLEARANCES REQUIRED
<br />BY OTHER TRADES AND NOTIFY OWNER'S REPRESENTATIVES OF ANY
<br />DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. ALL DIMENSIONS
<br />ARE TO THE FACE OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE, ALL
<br />DIMENSIONS TO BE TAKEN FROM ACTUAL BUILDING DIMENSIONS.
<br />THE CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHERE FIXTURES
<br />EQUIPMENT AND PIPING WILL BE INSTALLED AND SHALL REPORT ANY
<br />CONDITION THAT PREVENTS THE PROPER INSTALLATION OF THE PLUMBING
<br />WORK TO THE GC.
<br />HANGERS & SUPPORTS: THE PLUMBING CONTRACTOR SHALL F&I ALL PIPE
<br />SUPPORTS NEEDED FOR EQUIPMENT AND MATERIAL. ALL HORIZONTAL RUNS
<br />OF PIPING SHALL BE SUPPORTED BY PIPE HANGERS SPACED NOT MORE THAN
<br />10 FEET O.C. FOR PIPES 1-1/4" AND LARGER AND 8 FEET O.C. FOR PIPES
<br />SMALLER THAN 1-1/4" AND AT EACH JOINT FOR SOIL OR WASTE PIPE.
<br />ADDITIONAL SUPPORTS SHALL BE PROVIDED WHERE NEEDED TO PREVENT
<br />SAGGING. HANGERS AND PIPE ATTACHMENTS TO BE FACTORY FABRICATED
<br />WITH GALVANIZED COATINGS; NONMETALLIC COATED FOR HANGERS IN DIRECT
<br />CONTACT WITH COPPER TUBING.
<br />CONNECTIONS: INSTALL UNIONS ADJACENT TO EACH VALVE AND AT FINAL
<br />CONNECT ON TO EACH PIECE OF EQUIPMENT. INSTALL DIELECTRIC COUPLINGS
<br />TO CONNECT PIPING MATERIALS OF DISSIMILAR METALS. SCREW JOINT STEEL
<br />PIPING UP TO AND INCLUDING 1-1/2". WELD PIPING USE NON -LEAD,
<br />NON -ANTIMONY SOLDER FOR SOLDERING DOMESTIC WATER COPPER PIPE.
<br />INSTALLATION: INSTALL PIPING FREE OF SAGS AND BENDS. PROVIDE BRACKET
<br />STANDOFFS FROM MOUNTING SURFACES SUFFICIENT TO ALLOW V CLEANING
<br />SPACE AROUND ALL PIPING, INCLUDING ANY ADDED PIPING INSULATION.
<br />INSTALL FITTINGS FOR CHANGES IN DIRECTION AND BRANCH CONNECTIONS.
<br />INSTALL SLEEVES FOR PIPES PASSING THROUGH CONCRETE AND MASONRY
<br />WALLS, GYPSUM -BOARD PARTITIONS, CONCRETE FLOOR AND ROOF SLABS /
<br />STRUCTURE. SEAL PIPE PENETRATIONS THROUGH RATED CONSTRUCTION
<br />WITH FIRE -STOPPING SEALANT MATERIAL MEETING CODE, AHJ AND
<br />ARCHITECT'S REQUIREMENTS.
<br />BASIC MATERIALS AND METHODS (CONT.)
<br />UNDERGROUND WATER AND SEWER LINES SHALL BE LAID IN SEPARATE
<br />TRENCHES WITH A MINIMUM HORIZONTAL SPACING AS REQUIRED BY CODE AND
<br />AHJ, EXCAVATED TO THE PROPER DEPTH AND GRADED TO PRODUCE THE
<br />NEEDED FALL.
<br />EQUIPMENT: THE PLUMBING CONTRACTOR SHALL VERIFY ANY EQUIPMENT
<br />LOCATION AND SIZES REQUIRING PLUMBING CONNECTION(S) WITH THE TRADE
<br />AND VENDOR SUPPLYING THE EQUIPMENT PRIOR TO ROUGH -IN.
<br />CLEANOUTS: F&I J.R. SMITH OR EQUIVALENT FLOOR AND WALL CLEANOUTS AS
<br />INDICATED ON THE DRAWINGS AND WHERE NEEDED IN ALL SOIL, WASTE AND
<br />DRAIN LINES. IN AREAS WITH CERAMIC TILE OR CARPETED FLOORING, PROVIDE
<br />CLEANOUTS WITH SQUARE, ADJUSTABLE, NICKEL BRONZE TOP. IN AREAS WITH
<br />RESILIENT FLOORING, PROVIDE CLEANOUTS WITH SQUARE, ADJUSTABLE,
<br />NICKEL BRONZE TOP WITH TILE RECESS. CLEANOUTS SHALL BE SAME SIZE AS
<br />PIPE EXCEPT THAT CLEANOUTS LARGER THAN 4" WILL NOT BE REQUIRED.
<br />WHERE CLEANOUTS OCCUR IN WALLS OF FINISHED AREAS, THEY SHALL BE
<br />CONCEALED BEHIND CHROME PLATED ACCESS COVERS.
<br />TESTING: ALL PIPES SHALL BE TESTED BY AN APPROVED METHOD BEFORE
<br />THEY ARE BACKFILLED OR CONCEALED. AFTER TESTING IS COMPLETE, THE
<br />PLUMBING CONTRACTOR SHALL DISINFECT THE POTABLE WATER SYSTEM AS
<br />REQUIRED BY AHJ. TEST WATER PURITY ACCORDING TO AHJ AND SUBMIT
<br />CERTIFIED TEST RESULTS TO AHJ FOR REVIEW AND APPROVAL.
<br />INSULATION
<br />WATER PIPING: F&I THERMAL INSULATION ON ALL HOT & COLD WATER AND
<br />HORIZONTAL WASTE PIPING IN CEILING SPACES AND ON ALL COLD WATER
<br />PIPING IN CASEWORK AND BAR AREAS. USE SELF-SEALING CLOSED CELL FOAM
<br />OR JACKETED FIBERGLASS INSULATION WITH MANUFACTURER APPROVED
<br />ADHESIVES, SEALERS AND COATINGS. ALL MATERIALS USED SHALL HAVE A
<br />FLAME SPREAD INDEX NOT MORE THAN 25 A SMOKE DEVELOPED INDEX NOT
<br />MORE THAN 50. UNLESS OTHERWISE REQUIRED BY THE AHJ OR ENERGY
<br />CODES, THE MINIMUM INSULATION LEVELS SHALL BE AS FOLLOWS:
<br />PIPE SIZE INSULATION THICKNESS
<br />LESS THAN OR EQUAL TO 1-1/2" = 1"
<br />2" DIA. OR GREATER = 1-1/2"
<br />INSULATION VALUE = k VALUE NOT EXCEEDING 0.27 BTU " INCH/h'ft' F
<br />SAFETY COVERS: INSTALL NO -SCALD SAFETY COVERS WITH INSULATED FOAM
<br />LINER, TAMPER PROOF STRAP UNDER ADA SINKS AND WHERE REQUIRED BY
<br />CODE.
<br />ICE BIN DRAINS: INSULATE ICE BIN COPPER DRAIN LINES WITH 1/2"THICK,
<br />SELF-SEALING, SECTIONAL, CLOSED CELL FOAM.
<br />HVAC PIPING: INSULATE COOLING COIL PIPING AND CONDENSATE PIPING WITH
<br />CODE & MANUFACTURER SIZED, SELF SEALING, CLOSED CELL FOAM. INSULATE
<br />HVAC HOT AND CHILLED WATER PIPING SYSTEMS AND LOW PRESSURE STEAM
<br />AND CONDENSATE PIPING WITH CODE & MANUFACTURER SIZED, HEAVY DUTY,
<br />SELF SEALING, JACKETED FIBERGLASS.
<br />VALVES
<br />GENERAL: PLUMBING CONTRACTOR TO PROVIDE VALVES WHERE INDICATED ON
<br />PLANS AND AS NECESSARY FOR PROPER SYSTEM OPERATION AND
<br />COMPONENT ISOLATION. INSTALL VALVES FOR EACH FIXTURE AND ITEM OF
<br />EQUIPMENT. PROVIDE BRAIDED STAINLESS STEEL HOSE (UNLESS OTHERWISE
<br />NOTED) BETWEEN VALVE AND EQUIPMENT IN ACCORDANCE WITH
<br />MANUFACTURER'S SPECIFICATIONS. LOCATE SHUT-OFF VALVES ADJACENT TO
<br />EQUIPMENT FOR EASY ACCESS SUCH THAT VALVES CAN BE REACHED WITHOUT
<br />MOVING EQUIPMENT. PROVIDE STOP VALVES FOR ALL EQUIPMENT WHETHER
<br />SHOWN ON THE DRAWINGS OR NOT. ALL VALVES SHALL BE RATED FOR A
<br />MINIMUM OF 125 PSI OR GREATER (UNO).
<br />IF WATER PRESSURE SUPPLIED TO STORE IS GREATER THAN 65 PSI, THEN
<br />PROVIDE A PRESSURE REGULATOR AT SERVICE ENTRY TO MAINTAIN WATER
<br />PRESSURE (NOT NECESSARILY SHOWN ON DRAWINGS). PROVIDE BACKFLOW
<br />PREVENTION AND MAINTAIN SERVICE IF REQUIRED BY AHJ.
<br />NATURAL GAS
<br />GAS: PROVIDE LISTED AND APPROVED GAS SHUT-OFF VALVE AT ALL GAS
<br />APPLIANCES. PROVIDE GAS PRESSURE REGULATOR IF MEDIUM PRESSURE GAS
<br />DISTRIBUTION AND INSTALL PER CODE WITH VENT PIPE TO EXTERIOR OF
<br />BUILDING.
<br />NATURAL GAS PIPING: PIPING SHALL BE SCHEDULE 40, SEAMLESS, BLACK STEEL
<br />PIPE WITH CAST, SCREWED FITTINGS. ALTERNATIVELY, PIPE FITTINGS MAY BE
<br />OF THE PRESSED TYPE WITH THE FOLLOWING REQUIREMENTS:
<br />1. FITTINGS AND SYSTEM SHALL BE MANUFACTURED BY VIEGA.
<br />2. FITTINGS AND SYSTEM SHALL BE LISTED FOR NATURAL GAS PIPING,
<br />EXTERIOR AND COMMERCIAL RATED.
<br />3. CONTRACTOR TO PROVIDE CERTIFICATION ISSUED BY THE MANUFACTURER
<br />INDICATING THEY HAVE PROPER TRAINING TO INSTALL THEIR SYSTEM. THIS
<br />CERTIFICATION SHALL BE PROVIDED WITH SUBMITTALS OF THE PRESSED
<br />FITTINGS TO BE USED.
<br />COORDINATION WITH LANDLORD REQUIREMENTS
<br />CONTRACTOR SHALL COORDINATE WITH LANDLORD FOR ANY LANDLORD
<br />CONSTRUCTION REQUIREMENTS / SPECIFICATIONS. IF LANDLORD DOES HAVE
<br />REQUIREMENTS, CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR WITH
<br />REQUIREMENTS/ SPECIFICATIONS AND ADHERE TO THEM. WHERE LANDLORD
<br />REQUIREMENTS ARE MORE STRINGENT THAN SHOWN IN THESE PLANS,
<br />LANDLORD REQUIREMENTS SHALL GOVERN.
<br />GENERAL NOTES
<br />1. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR
<br />TO CONSTRUCTION.
<br />2. CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING WALLS, FLOORS,
<br />CEILINGS OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAY BECOME
<br />DAMAGED DURING THE COURSE OF WORK.
<br />3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT OR
<br />ARRANGEMENT OF SYSTEM(S). FOLLOW DRAWINGS IN LAYING OUT WORK AND
<br />CHECK DRAWINGS OF OTHER TRADES TO VERIFY SPACE CONDITIONS.
<br />MAINTAIN HEADROOM AND SPACE CONDITION.
<br />4. UNLESS OTHERWISE NOTED(SEE ARCH. SHEETS), THE CONTRACTOR SHALL
<br />REMOVE ALL EXISTING PLUMBING FIXTURES INCLUDING PIPING AND ALL
<br />OTHER MISC. DEVICES AS DIRECTED BY THE GC THAT IS NOT BEING SALVAGED
<br />OR REUSED. EQUIPMENT / FIXTURES INDICATED ON DRAWINGS TO BE REUSED
<br />SHALL BE INSPECTED AND IF DEFECTIVE, REPLACED. COORD. WITH GC AND
<br />OWNER.
<br />5. COORDINATE WITH ELECTRICAL CONTRACTOR FOR POWER CONNECTION TO
<br />ALL PLUMBING EQUIPMENT.
<br />6. STOP VALVES AND / OR SHUT OFF VALVES SHALL BE INSTALLED AT ALL
<br />PLUMBING FIXTURES AND APPLIANCES, EVEN IF NOT SHOWN IN PLANS.
<br />7. ALL PIPING AND / OR PLUMBING DEVICES SHALL BE SUPPORTED FROM
<br />STRUCTURE (NOT FROM EXISTING HVAC DUCTS OR PIPES). WASTE PIPING
<br />SHALL BE HELD AS CLOSE TO STRUCTURE AS POSSIBLE.
<br />8. COORDINATE PLUMBING ROUGH -IN AND CONNECTION REQUIREMENTS WITH
<br />KITCHEN EQUIPMENT CONTRACTOR PRIOR TO ROUGH -IN WORK.
<br />9. REFER TO PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION AND
<br />REQUIREMENTS FOR PLUMBING CONTRACTOR.
<br />10. PROVIDE ITEMS AND WORK AS REQUIRED TO COMPLETE THE INSTALLATION OF
<br />PLUMBING SYSTEMS TO FIXTURES AND EQUIPMENT: TRAPS, STRAINERS,
<br />GAUGES, GAS AND WATER PRESSURE REGULATORS, FLEXIBLE CONNECTIONS,
<br />STOP VALVES, UNIONS, ETC. PROVIDE AND CONNECT PLUMBING PIPE FROM
<br />ROUGH -INS TO ITEMS AS SHOWN, SPECIFIED AND REQUIRED.
<br />11. CONTRACTOR IS RESPONSIBLE FOR CONFORMANCE TO ALL LOCAL CODES.
<br />12. CLEAN FAUCET AERATORS AND PIPE STRAINERS BEFORE TURNING BUILDING
<br />OVER TO OW NER.
<br />13. PROVIDE TRAP PRIMERS WHERE REQUIRED BY LOCAL AUTHORITIES.
<br />PLUMBING ABBREVIATIONS
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />MAX
<br />MAXIMUM
<br />AHJ
<br />AUTHORITIES HAVING
<br />MECH
<br />MECHANICAL
<br />JURISDICTION
<br />MC
<br />MECHAN CAL CONTRACTOR
<br />APPROX
<br />APPROXIMATE
<br />MOP
<br />MAIN DISTRIBUTION PANEL
<br />MEP
<br />MECHANICAL, ELECTRICAL&
<br />BLDG
<br />BUILDING
<br />PLUMBING
<br />MFG
<br />MANUFACTURER
<br />CLG
<br />CEILING
<br />MIN
<br />MINIMUM
<br />CONST
<br />CONSTRUCTION
<br />MS
<br />MOP SINK
<br />CRL
<br />COMBINED RAIN LEADER
<br />CW
<br />DOMESTIC COLDWATER
<br />NIL
<br />NIGHTLIGHT
<br />NTS
<br />NOT TO SCALE
<br />DEG
<br />DEGREES
<br />DTL
<br />DETAIL
<br />OD
<br />OVERFLOW DRAIN
<br />ON
<br />DOWN
<br />OL
<br />OVERFLOW RAIN LEADER
<br />DWG(S)
<br />DRAWING(S)
<br />PS
<br />PREP SINK
<br />EA
<br />EACH
<br />POC
<br />POINT OF CONNECTION
<br />EC
<br />IELECTRCAL CONTRACTOR
<br />PM
<br />PROJECT MANAGER
<br />ELEC
<br />ELECTR CAL
<br />EM
<br />EMERGENCY
<br />RD
<br />ROOF DRAIN
<br />(E) OR (EX)
<br />EXISTING
<br />REF
<br />REFERENCE
<br />EXT
<br />EXTERIOR
<br />REQ('D)
<br />REQUIRE(D)
<br />REV
<br />REVISED/REVISION
<br />FD
<br />FLOOR DRAIN
<br />RL
<br />RAIN LEADER
<br />FS
<br />FLOOR SINK
<br />F&I
<br />FURNISH &INSTALL
<br />BHT
<br />SHEET
<br />FLR
<br />FLOOR
<br />SPECS
<br />SPECIFICATION(S)
<br />FT
<br />FOOT/FEET
<br />SF
<br />SQUARE FEET
<br />FCO
<br />FLOOR CLEANOUT
<br />SS
<br />STAINLESS STEEL
<br />GC
<br />GENERAL CONTRACTOR
<br />TEL
<br />TELEPHONE
<br />GFCI
<br />GROUND FAULT CIRCUIT
<br />TEMP
<br />TEMPORARY
<br />INTERRUPTER
<br />TYP
<br />TYPICAL
<br />GW
<br />GREASE WASTE
<br />TMV
<br />TEMPERATURE MIXING
<br />VALVE
<br />HR
<br />HOUR
<br />TW
<br />TEMPERED HOT WATER
<br />HVAC
<br />HEATING VENTILATING & AIR
<br />CONDITIONING
<br />UNO
<br />UNLESS NOTED OTHERWISE
<br />HW
<br />HOT WATER
<br />HS
<br />HAND SINK
<br />V
<br />VENT
<br />HWS
<br />HOT WATER SUPPLY
<br />HWR
<br />HOT WATER RETURN
<br />W
<br />SANITARY WASTE
<br />WH
<br />WATER HEATER
<br />ILL
<br />LANDLORD
<br />WP
<br />WEATHER-PROOF
<br />LV
<br />LOW VOLTAGE
<br />WCO
<br />WALL CLEANOUT
<br />PLUMBING SHEET INDEX
<br />Sheet List Table
<br />Sheet Number
<br />Sheet Title
<br />P0.01
<br />PLUMBING SPECIFICATIONS
<br />P2.01
<br />PLUMBING PLAN
<br />P5.01
<br />PLUMBING DETAILS
<br />P6.01
<br />PLUMBING SCHEDULES
<br />PLUMBING LEGEND
<br />NOTE: NOT ALL SYMBOLS MAY BE USED IN THESE DRAWINGS.
<br />— — — DOMESTIC COLD WATER
<br />DOMESTIC HOT WATER
<br />DOMESTIC TEMPERED WATER
<br />SANITARY WASTE
<br />— — — — VENT
<br />Iffi POINT OF CONNECTION
<br />oH— PIPE UP
<br />r� PIPE DOWN
<br />Ip TEE UP
<br />TEE DOWN
<br />lD4 GATE VALVE
<br />W BALANCING VALVE
<br />131 BALL VALVE
<br />d APPROVED GAS SHUT OFF VALVE
<br />O WATER METER
<br />4— WATER CONNECTION(STOP VALVE WHERE APPLICABLE)
<br />HOSE BIBB
<br />®® FLOORSINK
<br />XX DETAIL MARK
<br />PX.X
<br />SHEET WHERE DETAIL IS SHOWN
<br />OEQUIPMENT MARK - SEE SCHEDULE
<br />SCOPE OF WORK
<br />THIS PROJECT INCLUDES TENANT IMPROVEMENTS TO AN EXISTING RESTAURANT
<br />SPACE. THE PLUMBING SYSTEMS ARE EXISTING AND ONLY BEING MODIFIED AS
<br />INDICATED IN THESE PLANS.
<br />tpP1�R C.
<br />oQ a
<br />504 K
<br />o�sTgae°
<br />SSJONAL
<br />SHEET TITLE
<br />PLUMBING
<br />SPECIFICATIONS
<br />Permit Set
<br />P0.01
<br />
|