Laserfiche WebLink
Fusible Links/Detectors <br />PASS FAIL N/A <br />1. Specifications - All fusible links shall be positioned in brackets per manufacturer's ❑ ❑ ❑ <br />specifications. <br />2. Placement - Verify that a fusible links or heat detectors are provided above each ❑ ❑ ❑ <br />protected cooking appliance and at or within 12 inches of duct opening in <br />accordance with the extinguishing system manufacturer's design, installation, and <br />maintenance manual. (A single listed detection device shall be permitted for more <br />than one appliance when installed in accordance with the system's listing.) <br />3. Temperature - Ensure that the appropriate temperature fusible links that is ❑ ❑ ❑ <br />indicated on the plans are installed in the system. <br />4. Markings - The year of manufacture shall be stamped on all fusible links, and also ❑ ❑ ❑ <br />marked on the system inspection tag. <br />Agent Tanks & Mechanical Control Heads <br />PASS FAIL N/A <br />1. Agent Tanks - Verify that all Agent Tanks comply with all of the following: ❑ ❑ ❑ <br />• Tanks provided on site are the same model as indicated on approved <br />plans. <br />• Quantity of tanks match approved plans. <br />• Tanks are labeled UL300. <br />• Tanks are filled to correct volume. <br />• Tanks are fastened securely to their mounting brackets. <br />2. Control Heads - Verify Control Heads comply with the following: ❑ ❑ ❑ <br />• Listed devices <br />• Located in a safe location free from damage, high temperatures, and <br />accessible. <br />• Provided with a visual indicator to show that the system is in a ready <br />condition or is in need of recharging. <br />Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-10 4.29.2020 1 Page 4 <br />