Laserfiche WebLink
\\ <br /> Lighting Summary LTG-SUM <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R Revised Nov 2017 <br /> Project Info Project Title: DSE-1-Everett WA Date 4/30/2020 <br /> Compliance Applicant Information. Provide contact information for individual who can For Building Department Use <br /> forms do not respond to inquiries about compliance form information provided. <br /> require a Company Name: VAA,LLC <br /> password to <br /> use. Company Address: 2300 Berkshire Lane N,Plymouth MN 55442 <br /> Instructional and <br /> calculating cells Applicant Name: Derek R Sachs <br /> are write- <br /> protected. APPlicant Phone: 763-577-9100 <br /> Applicant Email: dsachs@vaaeng.com <br /> Project Description a New Building 0 Addition a Alteration No Lighting Scope <br /> Include PROJ-SUM form(included in envelope forms workbook)with lighting compliance forms. <br /> Interior Lighting System <br /> Description <br /> 11 Interior Lghtng Plans Included <br /> Interior Lighting Power a Buidng Area Method 0 Space-by-space Method <br /> Allowance Method Select method used in project. <br /> Interior Lighting Controls 0 Al C405.2.1-C405.2.8 Lghtng Controls a C405.2 Exception 5 Luminaire Level <br /> Lighting Controls(LLLC) <br /> a Additional Efficiency Package Option <br /> C406.4 Enhanced Digital Lighting <br /> To comply with C406.4,no less than 90%of the total installed interior lighting power shall comply with <br /> required controls per C406.4. <br /> Dwelling Unit Interior Permanently installed interior lighting fixtures in dwelling units comply with: No Dwelling <br /> Lighting 0 C405.2 thru C405.5 Commercial Lighting Controls and LPA Units <br /> Q C406.3 High Efficacy Lighting <br /> Q R404.1 Residential High Efficacy Lighting. Dwelling unit lighting complies with WSEC Residential <br /> provisions in lieu of WSEC Commercial provisions. <br /> Exterior Lighting System LED-Wall packs w/photocell-existing. <br /> Description Adding new emergency egress lighting above all personnel doors. <br /> 0 Exterbr Lighting Plans Included <br /> Building Additions Compliance Method Interior lighting Exterior lighting <br /> Lighting systems in addition area comply with all applicable a a <br /> provisions as a stand alone new construction project <br /> Refer to Section C502.2.6 for additional <br /> requirements. Lighting systems in addition are combined with existing a a <br /> building lighting systems to demonstrate compliance <br /> Addition is combined with existing: <br /> For interior lighting projects,include new+existing-to-remain interior lighting fixture wattage in <br /> Proposed Lighting Wattage table in LTG-INT-BLD or LTG-INT-SPACE form. <br /> For exterior lighting projects,include new+existing-to-remain exterior lighting fixture wattage in <br /> Proposed Tradable and Proposed Non-Tradable Lighting Wattage tables in LTG-EXT form. <br /> OCT 1 1 2021 <br /> CITY OF EVERETT <br /> Permit Services <br />