Laserfiche WebLink
Lighting, Motor, and E..ctricaI Permit Checklist, Pg'.-::" LTG-CHK <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R1 Revised Nov 2017 <br /> DSE-1-Everett WA Date 4/30/2020 <br /> The following information is necessary to check a permit application for compliance with the lighting,motor,and electrical requirements in the <br /> Applicability Location in Building uepartment <br /> (yes,no,na) Code Section Component Compliance information required in permit documents Documents Notes <br /> MOTORS,TRANSFORMERS, ELECTRIC METERS, INTERIOR TRANSPORTATION <br /> NA C405.6 Electrical Include electrical transformer schedule on electrical plans; <br /> transformers indicate transformer size,efficiency,or exception taker <br /> Dwelling unit Indicate on electrical plans that each dwelling unit in Group R-2 <br /> NA C405.7 electrical energy has a separate electrical energy meter <br /> consumption <br /> Electric motor Include all motors,including fractional hp motors,in electric <br /> NA C405.8 efficiency motor schedule on electrical plans;indicate hp,rpm,rated <br /> efficiency,or exception applied <br /> For luminaires in each elevator cab,provide calculated average <br /> efficacy of combined fixtures that indicates efficacy is not less <br /> than 35 lumens per watt; <br /> NA C405.9.1 Elevator cabs Indicate rated watts per cfm for elevator cab ventilation fans do <br /> not exceed 0.33 watts per cfm <br /> Indicate automatic controls that de-energize lighting and — <br /> . ._ -_.. <br /> ventilation fans when elevator is stopped and unoccupied for a <br /> period of 15 minutes or more <br /> Escalators and Indicate escalators comply with ASME A17.1/CSA B44; <br /> NA C405.9.2 ;moving walks automatic controls are configured to reduce operational speed tc <br /> the minimum permitted when not in use <br /> NA C405.9.3 Regenerative drive Indicate all one-way down or reversible escalators are provided <br /> with a variable frequency regenerative drive <br /> DOCUMENTATION AND SYSTEM REQUIREMENTS TO SUPPORT COMMISSIONING(Cx) <br /> Indicate that all electrical systems(receptacles,transformers, <br /> motors,vertical and horizontal transportation)for which the E8.XX <br /> WSEC requires control functions and/or configuration to <br /> Scope of electrical perform specific functions are required to be commissioned <br /> Yes C408.3 <br /> power and lighting Where`total buildingifghting load is>20 kW,or where total <br /> systems lighting load of luminaires requiring daylight sensing and/or <br /> commissioning occupancy control>10 kW,indicate that all automatic lighting E8 XX <br /> control systems are required to be commissioned;or provide <br /> building lighting power calculation demonstrating eligibility for <br /> exception: <br /> Indicate Cx requirements in plans and specifications for all E8 XX <br /> applicable electrical and Iightin control systems per C408; <br /> include general summary With-at minimum ftern Ifiru 4l oftfie" <br /> C405.13 Cx plan per C408.1.2 including:narrative description of <br /> C408.1.1 Commissioning activities,responsibilities of the Cx team,schedule of activities E8.XX <br /> Yes C408.1.2 requirements in including verification of project close out documentation per <br /> construction <br /> C408.1.4.2 C103.6,and conflict of interest plan(if reauired);, <br /> C103.6 documents Include in general summary that a Cx project report or <br /> Compliance Checklist(Figure C408.1.4.2)shall be completed E8.XX <br /> by the Certified Cx Professional and provided to the owner prior <br /> to the final electrical inspection <br /> Functional Identify in plans and specifications the intended operation of all <br /> Yes C408.3.1 performance testing equipment and controls during all modes of operation,including E8.XX <br /> criteria interfacing between new and existing-to-remain system; <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> Indicate in plans that project close out documentation is required <br /> Project close out including WSEC lighting compliance forms and calculations that <br /> Yes C103.6.3 documentation E8.XX <br /> document all interior and exterior lighting area and/or surface <br /> requirements <br /> types,lighting power allowances and installed densities <br /> If"no"is selected for any question, provide explanation: <br /> End of Lighting, Motor&Transformer Permit Documents Checklist <br /> � � � II <br />