Laserfiche WebLink
INSPECTION REPORT <br /> . zj\ E0 i21 <br /> Date: f 6 Permit: <br /> -r----0-- -- , <br /> Contractor: <br /> g5Owner: <br /> Site Address: - '�IMIllw ilL <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> eriling Grid ElDrywall Nailing ❑Plumbing Final <br /> lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> 7❑ <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS ER <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> L — C. <br /> Inspector., e--::: gDate l� <br /> EIR(4/09) ,l�u� amine FORMS ROMoneHs• 42:,488-890 <br /> i <br />