Laserfiche WebLink
,a, Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . . In this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> ® Project Information <br /> Property owner Name: /1/4---A t k' e ,`•e.; 6o id <br /> Project Address: 93"0''1 r7t-I4 Av SJ Parcel# <br /> City: !�✓-kr�4-4- State: W Pr- ZIP: <br /> 9g-206- <br /> Day Phone: 'Y2,�'— 1-,2_ <br /> 2- r7 92 7 <br /> Contractor Name %IPt . /✓IAwA` o iw 36 lAix- <br /> Contractor License#: J2 e_e..,N n15 g 3.2 L 0 <br /> Contractor Day Phone: . <br /> PV system description 2,0— 4--e.IC `J v 'ittitiVis6. AAx.1 S k le S j fi,,A, <br /> (Include manufacturer p J 52c30 s r- ��4—. <br /> and model##of PV 1 <br /> modules and <br /> Inverters): <br /> ()Determine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system Is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that X' ❑ <br /> Is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by Nd ❑ <br /> . the local jurisdiction. - <br /> 3, Rooftop is made from lightweight material such'as a single layer of composition shingles, <br /> metal roofing,lightweight masonry,or cedar shingles. El <br /> 4. The Installation shall comply with the manufacturer's Instructions.[IRC M2302,2] ❑ <br /> 5. The Installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to he ❑ <br /> administer the electrical code.[IRC M2302.2] <br /> G. The installation shall meet the requirements of the International Fire Code as amended <br /> by WA State.[IRC M2302.2] <br /> 7. The PV system Is designed for the wind speed of the local area,and will be installed per '�►,t p <br /> the manufacturer's specifications. [IRC M2302,2.1(1)] . 1� <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302,2.1(2)] J ❑ • <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per•square foot.[IRC M2302.2,1(3)] . ❑ <br /> Enter total dead load of system(lbs/ft2): <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the ❑ <br /> roofing to which they are affixed.[IRC M2302,2.1(4)] <br /> I - <br />