My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
D.K. Systems, Inc. 11/9/2023 Change Order 1
>
Contracts
>
Agreement
>
On-Call (not construction)
>
D.K. Systems, Inc. 11/9/2023 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 8:41:41 AM
Creation date
11/15/2023 8:41:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
D.K. Systems, Inc.
Approval Date
11/9/2023
End Date
10/25/2026
Department
Procurement
Department Project Manager
Jenny Chang
Subject / Project Title
HVAC Services and Repairs
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003524
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
On-Call (not construction)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
D.K. Systems Inc. 10/25/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Small Works\Purchase
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />CHANGE <br />ORDER/AMENDMENT # <br /> <br />Contract (Procurement) Number: Unit-Priced Contract Title: <br />IFB #2022-047 Unit Price HVAC Services and Repairs <br />Description of Change: <br />As allowed by Section 2.16, Pricing Adjustments, “Required Personnel” unit prices have been <br />amended as follows for the following lines: <br />Description Previous Hourly Rate New Hourly Rate <br />Refrigeration & Air Conditioning Mechanics – <br />Standard Time $139.00 $145.00 <br />Refrigeration & Air Conditioning Mechanics – <br />Overtime $209.00 $218.00 <br />Sheet Metal Workers – Standard Time $156.00 $160.00 <br />Sheet Metal Workers – Overtime $234.00 $240.00 <br /> <br /> <br />By signing below, City of Everett and the Contractor agree that the Contract shall be changed to the extent described in <br />the above “Description of Change.” This Change Order/Amendment only changes the contract between City of Everett <br />and the Contractor to the extent explicitly provided in this Change Order/Amendment. Signatures on this change order <br />may be ink, scanned pdf signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />D.K. Systems, Inc. <br />1355 Buslog Road <br />PO Box 886 <br />Burlington, WA 98233 <br /> <br />City of Everett <br />2930 Wetmore Avenue <br />Everett, WA 98201 Date <br /> <br /> <br /> <br />Name & Title: Darron Drake, President Mayor Cassie Franklin <br />Date: City Attorney Template Approved as to Form 5.17.23 <br /> <br /> <br /> <br /> <br /> <br /> <br />0001 <br />Darron Drake <br />11/09/2023 <br />11/09/2023
The URL can be used to link to this page
Your browser does not support the video tag.