<br />Phase 5, Task 19: Wonderware/SCADA Integration <br />Timmons Group will design and develop the integration between Wonderware (SCADA) and Cityworks to send asset <br />readings into Cityworks to automatically create work orders in Cityworks for operations staff based on the readings from <br />SCADA. Work orders would be associated with a related GIS asset and would be triggered both for corrective work (max <br />or min threshold hit) as well as preventive maintenance cycles (every 10 runtime hours) based on settings defined <br />in Cityworks. <br />Phase 5, Task 19: City Responsibility: <br />•City will schedule and provide attendance at discovery workshop for integration functional requirements & <br />design. (8-16 hours) <br />•Review of design documents once designed (2-4 FTE hours) <br />Phase 5, Task 19: Timmons Group Responsibilities and Deliverables: <br />•Develop integration per functional requirements <br />•Develop list of assets, their SCADA tag number, and associated work activities to be triggered by interval or <br />threshold readings. <br />•Verify GIS data will support the integration and recommend changes if needed. <br />•Configure work orders <br />•Configure asset reading settings for assets <br />•Design, build, test, and deploy application that will use Cityworks AP/ to import asset readings from SCADA <br />historian into Cityworks. <br />Phase 5, Task 19: Assumptions: <br />•Everett is responsible for revising G/S data model and capturing asset data to support this integration. <br />•Everett is responsible for any changes to the network and IT infrastructure (if needed) to make the SCADA <br />historian data available to Cityworks. <br />•This integration will be designed to trigger work activities based off measured asset reading value (pressure, <br />runtime hours, etc.) provided from SCADA. The functionality will not include the ability to trigger work from a <br />combination of reading value and time. <br />•City will provide review comments within 10 business days or a mutually agreed upon timeframe <br />•It has been indicated by Everett that triggered PM activities only need to be based on asset readings and do <br />not need to include time. <br />Phase 5, Task 19: Estimated Timeframe: <br />•The development of the integration will require approximately 8-10 weeks <br />PROPOSED CHANGE TO PROJECT SCHEDULE <br />Timmons Group has already begun or completed the additional tasks outlined herein. No additional changes to the project <br />schedule are anticipated. <br />COST ADJUSTME T SUMMARY <br />Impacts to existing project budget: <br />The following table outlines our total cost for the additional proposed Scope of Work. ---• • l9"Ul I IIIH:.-111 �--,, <br />Technical Services Group -configuration $12,560.00 <br />CIS Infinity Adjustment $940.00 <br />Additional Ad-hoc support repurposed from $12,462.40 inteqrations (below) <br />Descope of CivicPlus integration (13,210.40) <br />Descope of SCADA integration (12,752.00) Adjusted for SCADA integration <br />discovery and documentation (delivered) <br />Total $0.00 <br />• Page 4 <br />TIMMONS GROUP <br />YOUR VISION ACHIEVED THROUGH OURS. <br />WWW.TIMMONS GI S. COM <br />Category 2: For official use only/ disclosure permissible by law.