My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/11/15 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/11/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 9:23:45 AM
Creation date
11/16/2023 9:17:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: 2024 Everett Water System Vulnerability Assessment <br />Council Bill # <br /> <br />Project: 2024 Everett Water System Vulnerability Assessment <br />Partner/Supplier : G&E Engineering <br /> Location: N/A <br />Preceding action: None <br />Fund: 401 – Water & Sewer Utility Fund <br />Agenda dates requested: <br /> November 15, 2023 <br /> <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br /> Yes x No <br /> <br />Budget amendment: <br /> Yes x No <br /> <br />PowerPoint presentation: <br /> Yes x No <br /> <br />Attachments: <br />PSA <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Jeff Marrs <br /> <br />Phone number: <br />(425) 257-8967 <br /> <br />Email: <br />jmarrs@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The City of Everett seeks a Professional Services Agreement with G&E Engineering with a <br />total compensation amount not to exceed $88,660.00. Source of funds for this PSA will <br />be 401 – Water & Sewer Utility Fund. <br /> <br /> <br />Project summary statement: <br />The City of Everett (City) owns and operates a single source water supply and <br />distribution system which provides potable water to more than 650,000 residents <br />throughout Snohomish County. The City is interested in evaluating risk for its water <br />supply and distribution system when subjected to natural or manmade large hazard <br />events such as earthquakes, volcanic eruptions, flood, slides, terrorist attacks, etc. and <br />what mitigation measures are necessary to reduce these risks. <br />Results from this study will be used in the 2025 Risk and Resiliency Assessment of the <br />City of Everett’s water system to fulfil the EPA’s “America’s Water Infrastructure Act of <br />2018” (AWIA) requirement. <br /> <br />Recommendation (exact action requested of Council): <br />Authorize the mayor to sign a Professional Services Agreement with G&E Engineering for <br />the 2024 Everett Water System Vulnerability Assessment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.