Laserfiche WebLink
6 <br />system development charges in the following amounts: <br />1.Water and Sewer System Development Charges <br />*Domestic/Fire combination meter for Single Family Residences and Duplexes reviewed <br />under the International Residential Code, upsized due to the addition of a fire sprinkler <br />system. <br />The above table contains charges for inside City-limits. Areas outside City-limits, but <br />connected to the City’s water and sewer system, shall be charged the inside-City-limits <br />charge plus (unless otherwise required by law) a 25% surcharge. <br />2.Stormwater System Development Charge. In addition to water and sewer system <br />development charges, there shall be a stormwater system development charge based on <br />square footage of impervious surface area imposed on development within city limits <br />that contributes stormwater to the stormwater drainage system or to a receiving water <br />body or receiving waters*: <br />Development Type Stormwater System Development Charge <br />New Construction Base Charge (1 ISU ≤2500 sf): $998 <br />Additional charge for impervious area >2500 sf: $0.3992/sf <br />Existing <br />Development <br />adding new <br />impervious surface <br />area <br />Calculated per square foot of added impervious surface area <br />at $0.3992/sf <br />Meter Size <br />Water System <br />Development <br />Charge <br />Sewer System <br />Development <br />Charge <br />Total Water and <br />Sewer System <br />Development <br />Charges <br />¾” $5,478 $4,402 $9,880 <br />1” domestic/fire* $5,478 $4,402 $9,880 <br />1” $9,148 $7,351 $16,499 <br />1 ½” $18,242 $14,658 $32,900 <br />2” $29,197 $23,462 $52,659 <br />3” $54,779 $44,019 $98,798 <br />4” $91,317 $73,379 $164,696 <br />6” $182,579 $146,714 $329,293 <br />8” $292,138 $234,751 $526,889 <br />10” $419,993 $337,491 $757,484 <br />12” $616,267 $495,210 $1,111,477