Laserfiche WebLink
0 <br /> DONE! <br /> You have now completed the Small Project Stormwater Report for the Combined <br /> System. <br /> Please review any sections you may have skipped to ensure all areas have been completed. <br /> Ensure the following attachments have been added. <br /> V-Project Specific Stormwater Site Plan [This packet and drawings] <br /> J%1 Topographic Survey [if applicable]rTopo 1"U61-00 fill 4)eAdN'G-S, <br /> Declaration of Covenant <br /> 14,Construction TESC Drawings <br /> ❑ Underground Injection Well(UIC)Registration* [if applicable] <br /> *You may need to registerwith the Washington State Department of Ecology at least 60 <br /> days prior to commencing UIC Construction.For more information,visit. <br /> everettwa.pov/1985/Stommwater-Technical-Resources <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 19 <br /> the Combined Sewer Area-September 2022 <br />