Laserfiche WebLink
FIELD REPORT <br />controlled density fill (CDF) at the end of day. On 10/10 the contractor made slot cuts between the previously <br />dug slot cuts from 10/9 and backfilled with CDF. <br />Based on our observations, the temporary excavations appeared stable and showed no signs of sloughing or <br />caving while open. Based on our observations, no adverse effects from the excavation were observed to the <br />existing residence. <br />Photo 1—Installing pile #6 along south side of <br />Photo 2 — Making slot cuts between installed pin <br />existing building, looking east. <br />piles, looking northwest. <br />Signed: Reviewed: <br />Attachments: <br />Figure 1: Pin Pile Layout and Numbering Scheme <br />Table 1: Pin Pile Installation Log <br />22-389 4849 Spire Lane - FROI 2023.10.05_09.docx Page 2 PanGEO, Inc. <br />