Laserfiche WebLink
2022 Stormwater System Development <br />Fee Calculations <br />Permit #: PW2309-020 <br />Additional Notes: <br />Project Address: 517 95TH PI SW <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: Extend Driveway <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Mukilteo <br />Prepared By: Tawnya Herman Date: 9/25/2023 <br />Outside City Limits? INo <br />*Adds a 25%Surcharge <br />Supportive Housing Credit? INo <br />*Reduces by 80% <br />1 Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: BXXXX-XXX Type of Construction: <br />Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />- SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PW2309-020 Type of Construction: <br />Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />90 SF <br />Stormwater System Dev Fee: <br />$24.10 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />