Laserfiche WebLink
STEP 3. DETERMINE FLOW CONTROL REQUIREMENT <br />Does this project create greater than 200 square feet of net new impervious area (item F from <br />table above)? <br />x Yes No <br />If yes, then the project is not exempt and flow control is required. Complete entire <br />checklist <br />If no, then the project is exempt from the flow control requirement Skip the rest of <br />Step 3 and complete STEP 4 of this report <br />etermination of 'fee in -lieu of flow control' eligibility: <br />Is t rolect in the eligible sub -basin of the combined sewer area as depicted in <br />of the re 6-10 6-IS). of the City of Everett Design and Construction Standards ar <br />Soeciflcation g/ <br />If no, then the a option is not available for your project Ski a fee calculation <br />below and comple the rest of the checklist. <br />If yes, will this project close to take the fee option' Lead of designing and installing a <br />flow control facility? <br />x Yes No <br />calculate fee using the a ow and complete Steps 4 of this checklist <br />Eyes, then <br />(Step 5 not required). <br />If no, skip the fee calculation w and co ete the rest of the checklist <br />TablP46ir calculation of fee in-lieu-c ow control <br />I. EnterzolEal net new impervious (Item <br />F m table above <br />960 <br />Subtract 200 sf <br />rep <br />3. Fee per sf <br />$3.72ISF <br />Calculate Total Fee by multiplying item #2 by <br />item #3 <br />Z827.20 <br />z 8,27 .20 <br />City ofErereb Public Works <br />Small Pruett Slwmwffier See Plan Report lbrPnefuls in <br />Me Cwnbnetl Sewer Arei-September 2022 <br />