Laserfiche WebLink
Option 2B Rain Garden Design Worksheet <br />The top of the ponded surface area below the overflow shall beat lean 13.5%of the net new impervious <br />surface area draining to the rain garden. Projects that have a greater contributing impervious area to <br />the BMP shall use the larger of the two areas, or as an alternative may have the BHP sized by an <br />Engineer using a continuous runoff model to meet the flow control requirements of Section 6.10 of the <br />DCSS. The table below provides design geometry based upon contributing impervious area. Refer to the <br />Rain Garden Handbookfor Western Washlneton:AGuide for Design, Installation, and Maintenance <br />(Hinman all 2013) for construction guidance. Sioretention shall be designed in accordance with <br />section 6.10 of the DCSS and the SWMMW W. Use the following criteria for design of the <br />bioretention pond. <br />SEE SIORETENTION EXAMPLE AT THE BACK OF THIS PACKET FOR REFERENCE <br />The applicable Setback requirements in Section 4-4.1 (3) have been met, including: <br />• 50 feet setback from slopes greater than 15 percent and greater than 10 feet in height. <br />Minimum Side Slope = 3:1 Minimum Infiltration Rate = 0.3 ini <br />Minimum depth of Biosoil = 12-inches Pending depth = 6-inches <br />Freeboard = 6-inches <br />Table 2B—Small Project Rain Garden Flow Control Design Sizing <br />WWI <br />200 to 400 <br />54 <br />19 <br />400 to 600 <br />81 <br />36 <br />600 to 800 <br />108 <br />55 <br />800 to 1000 <br />135 <br />74 <br />1000 to 1200 <br />162 <br />95 <br />1200 to 1400 <br />189 <br />116 <br />1400 to 1600 <br />216 <br />137 <br />1600 to 1800 <br />243 <br />358 <br />1800 to 2000 <br />270 <br />1 180 <br />• Net new impervious area requiring mitigation fits): <br />• Contributing impervious area to BMP: <br />• Total contributing area including landscaped area (Rt): <br />Design Top of Funded Surface Area (fta) = 0.135'(contributing impervious area (ftt)) <br />fta <br />City ofErereb Public Works <br />Small Project Stmmw ar See Plan Reporl for Pneects in 15 <br />Me Caroni Sewer Ane-Sepkmber 2022 <br />