Laserfiche WebLink
0 <br />DONE! <br />You have now completed the Small Project Stormwaler Report for the Combined <br />System. <br />Please review any sections you may have skipped to ensure all areas have been completed. <br />Ensure the following attachments have been added. <br />❑ Project Specific Stormwater Site Plan [This packet and drawings] <br />❑ Topographic Survey [if applicable] <br />❑ Declaration of Covenant <br />❑ Construction TESC Drawings <br />❑ Underground Injection Well (UIC) Registration* [if applicable] <br />'Youmayneed to registerwith the Washington Slate DepartmenfofEcubgyatleast 60 <br />days priorfo commencing UIC Construction. For moo: information, via#. <br />emmre .wv1198&Stomwater-Technicat-Resources <br />City ofEremb Public Works <br />Smell larywil Srarmwelar Sea Pan Ranch far Paress in 19 <br />Me CmrnW Sewer Ano-September 2022 <br />