My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2701 ROCKEFELLER AVE NIMBUS 2024-01-03
>
Address Records
>
ROCKEFELLER AVE
>
2701
>
NIMBUS
>
2701 ROCKEFELLER AVE NIMBUS 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 11:25:32 AM
Creation date
11/21/2023 10:18:17 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2701
Tenant Name
NIMBUS
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3072
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Opportunity Zone Oevelopnlent LLC JN 19152 <br />June 6, 2019 Page 6 <br />foundation. For the latter condition, the foundation must be either poured directly against relatively <br />level, undisturbed soil or be surrounded by level, well -compacted fill. We recommend using the <br />following ultimate values for the foundation's resistance to lateral loading: <br />Coefficient of Friction 0.50 <br />Passive Earth Pressure 350 pcf <br />where: poi is Pounds par Cubic Foot, and Peaelw eards <br />Pressure Is computed using the Equivalent Fluid Density. <br />If the ground in front of a foundation Is loose or sloping, the passive earth pressure given above will <br />not be appropriate. The above ultimate values for passive earth pressure and coefficient of friction <br />do not include a safety factor. <br />a; MW sharing oesig <br />This section presents design considerations for cantilevered or tied -back soldier pile walls, and for <br />soil nailed walls. Since the most suitable choice is primarily dependent on a number of factors <br />under the contractor's control, we suggest that the contractor work closely with the structural <br />engineer during the shoring design. The choice of appropriate soldler pile installation methods <br />should be the responsibility of the shoring engineer and contractor, who should be provided with <br />the results of the subsurface explorations. Installation techniques often must be modified to <br />address conditions that are encountered in the actual construction process. This may be necessary <br />once the excavation extends through the glacial till Into the clean outwash sand below depths of 15 <br />to 27 feet below grade. This can also occur when boulders or other obstructions are encountered <br />within the glacially -compressed soils. We recommend that you request information from the <br />contractor regarding potential additional costs should shoring techniques need to be changed for <br />site conditions. <br />The sensitivity of adjacent buildings, streets, and utilities must be considered in the design to <br />reduce the risk of causing settlement of these adjacent elements. Regardless of the system used, <br />all shoring systems will deflect In towards the excavation. Therefore, there is always a risk of <br />noticeable settlement occurring on the ground behind the shoring wall. These risks are reduced, <br />but not entirely eliminated by, using more rigid shoring systems such as soldier piles and tie -back <br />anchors. The General section should also be reviewed for additional shoring considerations. <br />The shoring design should be submitted to Geotech Consultants, Inc. for review prior to beginning <br />site excavation. We are available and would be pleased to assist in this design effort. Safety <br />factors of 1.2 and 1.5 should be used for temporary and permanent shoring designs respectively. <br />Also, If the shoring Is considered permanent, the seismic surcharge provided In the Foundation <br />and Retaining Well section needs to be included. <br />Cantilevered and Tleal-Back Soldier Piles <br />Cantilevered and tied -back soldier pile systems have proven to be an efficient and <br />economical method for providing excavation shoring. Tied -back walls are typically more <br />OaOTECN CONS6LT<.Nrs, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.